Download Print this page

Advertisement

Quick Links

INSTALLATION AND
OWNER'S INSTRUCTIONS
DIAMOND / CHDIAM01
1

Advertisement

loading

Summary of Contents for CITY HOOPS DIAMOND

  • Page 1 INSTALLATION AND OWNER’S INSTRUCTIONS DIAMOND / CHDIAM01...
  • Page 2: Safety Instructions

    SAFETY INSTRUCTIONS WARNING FAILURE TO COMPLY WITH ANY OF THE WARNINGS IN THESE INSTRUCTIONS MAY RESULT IN PERSONAL INJURY FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE. PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY DO NOT ATTEMPT TO ASSEMBLE THIS SYSTEM WITHOUT CAREFULLY READING AND FOLLOWING ALL INSTRUCTIONS.
  • Page 3 DIAMOND / CHDIAM01...
  • Page 4 ¾” Wrench A minimum of 2 Ladders 15/16” Wrench Spirit / Bubble / Carpenter Level ½” Wrench Water Supply Hammer or Mallet Pole hole digger / earth auger Tape Measure 20” Sonotube IF REQUIRED Shovel 24” Sonotube (for Diamond) IF REQUIRED...
  • Page 5 DIAMOND / CHDIAM01 STEP 1 (Digging The Footing) Before digging, call to locate any buried utility lines. NOTE: The back of the anchor kit must be 15 inches away from any wall, fence, or obstruction to allow room for the adjustable crank.
  • Page 6 DIAMOND / CHDIAM01 STEP 3 (Concrete) Mix the concrete according to the instructions on the bags. Note that a thicker mix of concrete will dry stronger than a thin mix. Pour the concrete into the hole, stopping approximately 18 inches from the top of the hole.
  • Page 7 DIAMOND / CHDIAM01 ASSEMBLY OF YOUR CITY HOOPS BASKETBALL SYSTEM STAGE 2 OF 2 WARNING NEVER USE THE SYSTEM WITHOUT FOLLOWING THE CEMENTING & CONCRETE INSTRUCTIONS. FAILURE TO FOLLOW ALL THESE INSTRUCTIONS AND WARNINGS COULD LEAD TO SERIOUS PERSONAL INJURY OR PROPERTY DAMAGE AS LISTED ON PAGE 2.
  • Page 8 DIAMOND / CHDIAM01 WARNING DUE TO THE SIZE AND WEIGHT OF THE SYSTEM, A MINIMUM OF THREE ADULTS ARE REQUIRED FOR THE FOLLOWING STEPS STEP 1 (Assembling The Vertical Post) Slide a 18mm Thick Washer (U3) over each of the J-Bolts (U2) as shown in FIGURE 1A Remove the Padding from Main Post (A).
  • Page 9 DIAMOND / CHDIAM01 STEP 3 (Assembling Adjustable Actuator) Connect Actuator to Main Extension Arm Place the upper bracket of Actuator(B) between the last set of welded tubes on the Main Extension Arm (F), attach the two parts using Hex bolt M20X390mm (#4), two Flat Washers M18 (#10), one Lock nut M20 (#13).
  • Page 10 DIAMOND / CHDIAM01 STEP 5 (Assembling Upper Extension Arms) Attach the 2 Upper Extension Arms(G) to Main Post(A), with a Hex Bolt M16x370mm (#6)), two Flat Washers M16 (#12), two Nylon washers M16 (#2), and One Lock Nut(#15). CAUTION: Injury may occur if Upper Extension Arms are allowed to fall off Main Extension Arm during assembly.
  • Page 11 DIAMOND / CHDIAM01 STEP 7 (Assembling Rim To Backboard) Insert the 4 Plastic and Steel Spacers (M) into the 4 holes on the backboard. CAUTION: Do not proceed with rim installation without these spacers. Remove the screws on Rim Spring Box Cover, open the Spring Box.

This manual is also suitable for:

Chdiam01