Installation Guide
EG2-S
Ethernet Gateway
Mounting & Installation
EG2-S must be mounted in a suitable enclosure to provide regulatory
protection from electric shock hazard as well as protecting the iCANnet
data network from tampering that could lead to reduced network security.
Ensure selected enclosure provides adequate cooling ventilation.
Fixing to DIN rail
1. Fix top clips over DIN rail.
2. Pull down bottom clip using screwdriver.
3. Close module towards DIN rail.
4. Push up bottom clip to fix securely to DIN rail.
1
2
4
iLight
Usk House, Lakeside
Llantarnam Park,
Cwmbran,
NP44 3HD, UK
t: +44 (0)1923 495495
e: enquiries@iLight.co.uk
www.iLight.co.uk
EU Authorised Representative
Cooper Lighting Netherlands B.V.
High Tech Campus
HTC 48
Eindhoven
5656 AE
E&OE. iLight reserve the right to make
changes to the equipment without
prior notice.
© Signify Holding
Doc No: 9850-000916--00
Removing from DIN rail
1. Pull down bottom clip with screwdriver.
2. Lift module away from DIN rail.
3
1
Typical Schematic
Lighting Source
Network Sensor
Controller
Technical Data
Electrical & Mechanical
Control: Via iLight network connection
Supply: +10 - 24V DC @ 750 mA Max (via external power supply)
Terminal Size: iCANnet cable size: 5 x 1mm
Protection: Provided by installer
Recommended Cable: iCANnet Network Cable
Ambient temperature: 2°C – 50°C
Relative humidity: 5% - 95% max, non-condensing
IP rating: IP20
Installation: Installation must be carried out by a suitably qualified electrician
and installed in a suitable DINrail enclosure.
Dimensions: 106mm (w) x 91mm (h) x 62mm (d)
Weight: 0.22kg
Software
For programming EG2-S, Device Editor software is required.
Please consult your iLight representative for latest versions.
2
Remote PC
Local PC
WWW
WIFI Router
EG2-S
Ethernet Gateway
iCAN Network
. Power cable size: 2 x 1mm
2
2
Laptop /
Wireless Devices
Need help?
Do you have a question about the EG2-S and is the answer not in the manual?
Questions and answers