Download Print this page
Larson Electronics SPG530-500AH-24V-4X120V-TLR10 Operation Manual

Larson Electronics SPG530-500AH-24V-4X120V-TLR10 Operation Manual

Portable solar power generator

Advertisement

Quick Links

OPERATION MANUAL
Portable Solar Power Generator
SPG530-500AH-24V-4X120V-TLR10
TABLE OF CONTENTS
DEPLOYING THE UNIT..........................................................................................Page 2
SOLAR CONTROLS ..............................................................................................Page 3
REMOVING THE HITCH.........................................................................................Page 3
PREPARING FOR TRANSPORT.............................................................. .............. Page 4
Page 1 of 4

Advertisement

loading

Summary of Contents for Larson Electronics SPG530-500AH-24V-4X120V-TLR10

  • Page 1 OPERATION MANUAL Portable Solar Power Generator SPG530-500AH-24V-4X120V-TLR10 TABLE OF CONTENTS DEPLOYING THE UNIT…………………………….……………………………………………..Page 2 SOLAR CONTROLS …...…………….…………….……………………………………………..Page 3 REMOVING THE HITCH……………………...……………………………………………………..Page 3 PREPARING FOR TRANSPORT……..……………………………………………… ……..…… Page 4 Page 1 of 4...
  • Page 2 SPG530-500AH-24V-4X120V-TLR10 SERIES OPERATION DEPLOYING THE UNIT MANUAL Choose a location that is close to level as possible to position the trailer. Drop the trailer from the tow vehicle using the single hand jack located on the front of the trailer. Ensure that the safety chains, trailer cable, and breakaway lanyard have been disconnected from the tow vehicle.
  • Page 3 SOLAR CONTROLS The job box consists of all the solar controls and electronics. The following switches should be turned ON for proper function.  Yellow Breaker ON – Solar Controller cutoff switch. Enables battery charging.  Black Toggle Switch ON and Breakers ON – Enables power to all electronics separate from the solar controller and solar panels.
  • Page 4 PREPARING FOR TRANSPORT 1. Power off all equipment. Open the job box and position the main power switch OFF. If you wish to turn off the solar controller and charger during extended periods of storage time. Switch the main disconnect and breakers off. 2.