Qnergy PowerGen 5650 Series Installation & Commissioning

Hide thumbs Also See for PowerGen 5650 Series:

Advertisement

Quick Links

Installation & Commissioning
Checklist
FOR A QUALIFIED INSTALLER
7045-102124-000
June 1, 2021

Advertisement

loading
Need help?

Need help?

Do you have a question about the PowerGen 5650 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Qnergy PowerGen 5650 Series

  • Page 1 Installation & Commissioning Checklist FOR A QUALIFIED INSTALLER 7045-102124-000 June 1, 2021...
  • Page 2 No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, scanning, or using any information storage and retrieval system, without prior written consent of Qnergy. Nor may the publication be disclosed to third parties.
  • Page 3 Gas Connection Customer Gas Pressure to PowerGen • 3-50 PSI, Natural Gas • 2-10 PSI, LPG • Biogas (consult with Qnergy Engineering Dept.) Earth Ground Connection to front of PowerGen enclosure Customer Signature Date (DD/MM/YYYY) Table 1-2 Safety Checks and Basic Information...
  • Page 4 Appliance Site (Country, City and Place) Site Name GPS Location Commissioning Date PowerGen Serial Number OptConnect Modem SN PowerGen Model and 5650 1800 1200 Low Temp add-ons: Qnergy Gas Conditioning (GCU) Modbus Switch Commissioning Technician Name Commissioning Technician Authorized Serial Number...
  • Page 5 OWER EPORTS AND HECKLISTS 1.3 COMMISSION SEQUENCE Table 1-4 Commissioning Checklist Step # Step Initials Connect 12VDC Battery in PowerGen • Connect ring terminal on black wire to the black terminal on the battery Disconnect customer electrical load Engine Helium Fill •...
  • Page 6 • Customer load to be connected only after initial running of the PowerGen • Check wiring, check grounding Reconnect customer electrical load to Qnergy terminal blocks after verifying customer loads: • Measure voltage and current output from PowerGen • Verify load does not exceed generated power...
  • Page 7 OWER EPORTS AND HECKLISTS Table 1-5 FPC Expansion Board Discrete Input Configuration Input Default Configured to: Initials Table 1-6 FPC Expansion Board Relay Output Configuration Input Default Configured to: Initials...
  • Page 8 OWER EPORTS AND HECKLISTS 1.4 POWERGEN ANNUAL INSPECTION CHECKLIST Annual Inspection Start Time: ____________AM PM End Time: ____________AM PM Table 1-7 General Information General Informaiton Customer Name Site Name Annual Inspection Date PowerGen Serial Number Technician Name/Distributor Name Table 1-8 Annual Inspection Checklist PowerGen Annual Inspection Checklist Initials Inspect the flue, fuel piping, and electrical connections for signs of...
  • Page 9 OWER EPORTS AND HECKLISTS Table 1-8 Annual Inspection Checklist PowerGen Annual Inspection Checklist Initials Check the engine mounting screws (M6 bolts) are tight on the engine body, if loose replace washers with spring lock washers and tighten. Enable the PowerGen and measure the Lambda emissions at the exhaust outlet port.
  • Page 10 OWER EPORTS AND HECKLISTS...