Summary of Contents for Feeney DesignRail LED 40W-DK
Page 1
Rev: 10/21 DesignRail 24V LED Post Accent Light ® Installa on Instruc ons Drivers are available in a variety of wa ages. In general a driver should not exceed more than 80% of its rated wa age. (Example: 60W Driver = 60 x 0.8 = 48W Max). Building codes vary by loca on and jurisdic on.
Step 1 - Install Drivers Step 1A – Connect Source Power to Driver IMPORTANT SAFETY NOTE: TO REDUCE RISK OF ELECTRICAL SHOCK, TURN OFF AC CIRCUIT BREAKER PRIOR TO COMMENCING ANY ELECTRICAL WORK AND CONNECTING DRIVER(S) TO AC POWER SOURCE. VERIFY THAT LIVE POWER IS NOT PRESENT AT JUNCTION BOX WHEN MAKING CONNECTIONS. Determine loca on of driver.
Page 4
Step 1B - Drill Posts and Route Starter Cable Determine the post that will act as the star ng post, this will likely be designated on the ligh ng layout schema c received with the order. Installing the starter cable through the post is easiest when 1/2"...
Page 5
Step 1B – Con nued For systems with Series 150 top rail: TOP OF POST Drill a 1/2” diameter hole ver cally centered between the factory pre-drilled top rail RCB holes. This will allow the LED 1-3/16" 2-way spli er and LED extension cable to pass through the RCB hollow Repeat this step for each post which will (See Figure 1.4).
Page 6
Step 2 - Prepare Posts and Run Wiring Step 2A – Prepare Post for Moun ng Plate Locate the moun ng plate in the desired loca on on the post. Place the top of the plate at least 4-1/2” down from the top of the post.
Page 7
Step 2B – Con nued For systems with Series 150 top rail: String an extension cable between each post, feeding it through the RCB and 1/2" hole, then connect a 2-way spli er. Feed one branch of the spli er out through the 1/2" lead wire pilot hole 2-WAY drilled in the previous step, this becomes the lead wire for the SPLITTER...
Page 8
Step 3B – A ach LED Array Step 3C – Insert Lens Feed LED array lead wire through array bracket and a ach to Slide the lens onto the moun ng plate, by inser ng back plate spli er branch or . Push excess wiring and connectors back into into angled receiver fl...
Page 9
Step 4 - Aperature Adjustments (op onal) Step 4A – Loosen LED Array Bracket Step 4B – Adjust LED Array Bracket Slide the cover upwards on moun ng plate, enough to expose Slide the LED array bracket up or down to acheive desired light the nut on the LED array bracket.
Page 10
LED Post Accent Light - Troubleshoo ng Scenario #1 - If all loca ons do not illuminate, there could be a polarity issue 1. Turn off AC circuit breaker prior to con nuing the next procedure. 2. Swap the wires at the driver terminals 3.