Concealed Damage - Valco Instruments Co. Inc. 340-0X Instruction Manual

Dynacalibrator
Table of Contents

Advertisement

OUTER
CARTON
INNER
CARTON
POSITIONING
SUPPORT MEMBER

Concealed Damage

Concealed damage is damage which is not apparent until after the equipment
has been unpacked and examined or tested. In the event that concealed damage
is discovered, a written request for inspection must be forwarded to the carrier's
agent within 15 days of the delivery date. All cartons and packing materials must
be kept intact for the inspection. Delay in submitting the inspection re quest or
destroying the packing materials may give grounds for refusal of any claim.
After inspection, the carrier's agent will usually request the return of the
equipment to VICI for inspection and repair. When this work is completed,
the equipment will be returned to you with an invoice itemizing charges for
all re pairs. This invoice will become part of your claim to the carrier.
In the case of shipments made F.O.B. destination, VICI will, at your request, handle
the filing of damage claims with the carrier provided an acceptable inspection
report from the carrier is furnished to VICI. If, however, the claim is disallowed
through no fault of VICI, repair charges will be billed di rectly to you.
Figure 3: Dynacalibrator packaging
You must unpack and fully inspect the equipment and
file a written request for inspection with the carrier within
15 days of delivery to ensure claim satisfaction in the event
of concealed damage.
TAPE ON INNER AND
OUTER CARTONS
CORNER
BLOCKS
Getting Started
7

Advertisement

Table of Contents
loading

Table of Contents