AGT INDUSTRIAL AGT-ST4040C Product Manual

AGT INDUSTRIAL AGT-ST4040C Product Manual

40ft x 40ft container roof shelter

Advertisement

A G T - S T 4 0 4 0 C 4 0 F t x 4 0 F t C o n t a i n e r R o o f S h e l t e r
WARNING
sales@agrotkindustrial.com
PRODUCT MANUAL
Please read the product manual completely before assembly.
Check against the parts list to make sure all parts are received.
Wear proper safety goggles or other protective gears while in
assembly.
Missing parts or questions on assembly?
Pleasecontact sales@agrotkindustrial.com
https://www.agrotkindustrial.com/
https://www.agrotkindustrial.com
1
/

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AGT-ST4040C and is the answer not in the manual?

Questions and answers

Steve Enlow
April 11, 2025

need HGTH13RO640 owners manual

Subscribe to Our Youtube Channel

Summary of Contents for AGT INDUSTRIAL AGT-ST4040C

  • Page 1 PRODUCT MANUAL A G T - S T 4 0 4 0 C 4 0 F t x 4 0 F t C o n t a i n e r R o o f S h e l t e r WARNING Please read the product manual completely before assembly.
  • Page 2: Main Specifications

    Main Specifications :  Overall assembled size : W12x L12 x H3.6 (m) / W40 x L40 x H12(ft)  Width : 12 m / 40ft  Length : 12 m / 40ft  Ridge peak height : 3.6 m / 12ft + container height Prior to assembly Please read the instructions carefully before installation.
  • Page 3: Installation Steps

    Installation steps Step 1: Review the whole structure and choose the proper installation site Choose a solid flat level ground area to set up the building. Do not install the building on soft ground, wetland, uneven surfaces, sloped surfaces, or on top of structures that are not rated to hold its weight.
  • Page 4 Baseplate for front and rear truss rightcorners Base clamp connector Base tube connecting plate Top cover tension tube 2 groups (for both bottom sides) Ridge steel tension cables Cable connection plate Ratchets Pipe clamps Hex bolt M10x30 and nuts Pull ear Tie down straps Hex bolt M10x90 and nuts...
  • Page 5 Step 2 : Place the containers making sure they are parallel and the correct width apart. Make sure there is a gap of about 3 feet around the building. the center point of the round pipe of the base is the reference point, and the diagonal X and Y must be equal.
  • Page 6 Step 3 : Assemble all trusses The building includes 9 trusses : (1) front truss, (1) rear truss, and(7) middle  trusses. Connect all pipes with Self locking bolt (#15 ). Parts used to install the front and rear truss in this step. (refer to figure 2) ...
  • Page 7 Figure 3 Lay down all (9) trusses on the ground when the assembly is all completed and  before moving to next step, and then wrap (#21) around the sharp points of the joint to avoid friction between the fabric and the interface, resulting in fabric damage.
  • Page 8 different directions. When the truss is up, tie the ropes to the heavy objects to make sure the truss will stay upright steady, and use Self locking bolt (#15)to connect the truss to the base plate, total (4) Self locking bolt (#15) are used to secure one truss on the baseplate.
  • Page 9 As shown on (figure 6), when you are ready to install the roof cover (#20),  unpack the cover and position it parallel to the building frame on one side. The cover must be pulled over the top of the truss frame without being ...
  • Page 10: After The Installation

    - (20) Pipe clamps (#11) - (20) Hex bolt (#11A) - (38) Tie down straps (#13) - (4) Tension tube end water plug (#17) - (10) Plastic hose (#18) - (8) Connector (#19) Figure 7 After the Installation Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported.

Table of Contents