Enertech EAD Series Installation, Operation And Maintenance Manual

Enertech EAD Series Installation, Operation And Maintenance Manual

Ead multi-position air handlers & eed micro channel cased "a" coils

Advertisement

Installation, Operations, & Maintenance Manual
EAD MULTI-POSITION AIR HANDLERS & EED MICRO CHANNEL CASED "A" COILS












20D833-01NN
20D833-01NN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EAD Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Enertech EAD Series

  • Page 1 Installation, Operations, & Maintenance Manual EAD MULTI-POSITION AIR HANDLERS & EED MICRO CHANNEL CASED “A” COILS                20D833-01NN 20D833-01NN...
  • Page 2 This Page Intentionally Left Blank EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 3: Table Of Contents

    Wiring Diagram ................................15 Section 10: Down-Flow Conversion and Horizontal Application Disassembly ................................... 16 Assembly ..................................17 Horizontal Installation ..............................18 Revision Table ................................19 EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 4: Section 1: Model Nomenclature

    PROPRIETARY AND CONFIDENTIAL Unit Capacity (Nominal MBTUH): THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF ENERTECH GLOBAL, LLC. 018, 024, 036, 048, 060, 072 ANY REPRODUCTION IN PART OR AS A WHOLE, WITHOUT WRITTEN CONSENT, IS PROHIBITED.
  • Page 5: Section 2: Introduction Overview

    NOT hazard related. Enertech Global has set forth this policy to ensure that “CAUTION” Indicates a potentially hazardous situation or an installations of Enertech Global geothermal systems are done unsafe practice which, if not avoided, COULD result in minor or safely and properly.
  • Page 6: Section 3: Pre-Installation Pre-Installation

    IF THE UNIT IS INSTALLED IN NON-CONDITIONED SPACE, SUCH AS AN ATTIC OR GARAGE, THE INSTALLER MUST PROVIDE A FULL SIZE AUXILIARY DRAIN PAN TO PREVENT DAMAGE FROM CONDENSATE RUN-OFF. EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 7: Section 4: Installation Ductwork

    Table 3: EZ-Trap Kits Air Handler Part Number Description ACDT1A EZ-Trap 3/4” Kit EZ-Trap 1” Kit ACDT2A (3/4” MPT x 1” FPT adapter required) Return Air Plenum EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 8: Section 5: Dimensional Data Air Handler Dimensional Data - Models 018-024

    3/8” - 5/8” Sized for 1/2” or 1” 190 Lbs 95 Lbs AFR2020A Conduit 3/8” - 3/4” 060-072 3/8” - 7/8” 210 Lbs 100 Lbs AFR2320A  EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 9: Air Handler Dimensional Data - Models 036-048

                             EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 10: Air Handler Dimensional Data - Models 060-072

                             EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 11: Section 6: Wiring And Controls Thermostat Wiring

    50% of the full load modes. airflow (CFM) level (based on DIP switch settings). 4. DIP switches are provided to change blower CFM settings. EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 12: Air Handler Fan Speeds

    On On On Off On On Off Off Notes: 1. Program B (Bold Type) is factory settings and rated CFM.  CFM is controlled within 5% up to the Max ESP. 2. Max ESP testing was done with dry coil. 3. Max ESP for AD018 through AD072 models with external electric heat is 0.8 in. w.c. Exceeding the Max ESP may result in nuisance trips of the electric heat. Thermal limits are  rated at 100,000 cycles. EAD Series Dehumidification Mode Options DIP Switch Mode Operation Normal Dehumidification mode disabled (Normal Htg/Clg CFM)‐‐ Factory setting. On Demand Dehumidification mode (humidistat input at terminal ODD)‐‐ Humidistat  required. Constant Dehumidification mode (always uses dehum CFM for cooling and normal CFM  Constant Dehum for heating)‐‐No humidistat required.  Not Used Not an applicable selection. Notes: 1. To enter dehumidification mode, ODD input should be 0 VAC; for normal cooling CFM, ODD input should be 24 VAC. 2. Heating CFM is not affected by dehumidification mode.  When in dehumidification mode, cooling CFM is 85% of normal CFM. EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 13: Thermostat Wiring Diagram

    The ECM Board and Thermostat Control strip will pop/ slide out together from the “snap locks”. “Snap lock” Locations: • 2 for 018-024 Cabinet • 4 for 036-072 Cabinet EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 14: Section 7: Unit Electrical Data Ead Electrical Data

    15kW, 208/230V, 60HZ, 1 Phase, with Circuit Breaker and Single Point Connection 060-072 Note: 15kW heaters come with a single point connection jumper bar assembly factory installed. EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 15: Section 8: Wiring Diagram Wiring Diagram

    Section 8: Wiring Diagram Wiring Diagram EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 16: Section 10: Down-Flow Conversion And Horizontal Application Disassembly

               Figure 1       EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 17: Assembly

     ⚠ WARNING ⚠  IF UNIT IS BEING INSTALLED ON COMBUSTIBLE FLOORING, A NON-COMBUSTIBLE BASE MUST BE USED. UNIT CANNOT BE INSTALLED ON CARPETING. EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 18: Horizontal Installation

    (some drain pans may require a middle support). Place unit in a secondary drain pan and hang drain pan with threaded Figure 4 rods. EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 19: Revision Table

    Air Handler and Cased Coil nomenclature updated. 22JUL2020 Minor layout changes made Various 29MAY2020 Air Handler Fan Chart updated 27APR2020 Layout changes made Various 01DEC2019 Document created EAD Series Air Handlers & EED Series Cased Coils Enertech Global Installation and Operations Manual...
  • Page 20 Customer Service department at info@enertechgeo.com. Statements and other information contained herein are not express warranties and do not form the basis of any bargain between the parties, but are merely Enertech Global’s opinion or commendation of its products.

Table of Contents