Advertisement

Quick Links

MG Energy Monitor
MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands
+31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu
MGEMD010001
Manual EN
Version:
1.0
Date:
26-03-2020
Innovation
in energy storage

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MGEMD010001 and is the answer not in the manual?

Questions and answers

Summary of Contents for MG Energy Systems MGEMD010001

  • Page 1 Innovation in energy storage MG Energy Monitor MGEMD010001 Manual EN Version: Date: 26-03-2020 MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 2 PRICE OF THE MG ENERGY SYSTEMS B.V. PRODUCTS DESCRIBED HERE IN. MG Energy Systems B.V. reserves the right to revise and improve its products as it sees fit. This publication describes the state of this product at the time of its publication and may not reflect the product at all times in the future.
  • Page 3: Table Of Contents

    Minimal start ......................... 15 7.1.3 Expanded start ......................16 7.1.4 Devices .......................... 16 7.1.5 Alarms ........................... 16 MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 4 10.1 Specifications ........................28 10.2 Dimensions ..........................29 ORDERING INFORMATION ......................30 CONTACT DETAILS ........................31 MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 5: General

    Table 1 - Document history Revision Date Changes Revision author 26-03-2020 Initial document. Diederik Glashouwer 15-05-2020 Minor changes. Mark Scholten MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 6: Terms, Definitions, And Abbreviations

    IEC 61162-1. State-Of-Charge; is the remaining capacity in a battery cell or module in percent (%). MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 7: Safety Instructions

    Use insulated tools during when working on a battery system.  Make sure the locale regulations for working on battery systems are followed. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 8: Qualifications And Training

    Check the local safety rules and guidelines they have higher priority over the manufacturer’s specification in this manual in case of regulatory conflicts. Instruction and training can be carried out by MG Energy Systems B.V. by order of the user company. 2.2.3...
  • Page 9: Transport, Storage, And Unpacking

    MG Energy Monitor MGEMD010001  Termination resistor male MGM12000010  M12 Female 90° to RJ-45 Cable MGM12001033 MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 10: General Description

    Energy Monitor via a series of pages, some of which can be altered to precisely match the users specific use case. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 11: Device Models

    Device is treated according the Waste Electrical and Electronic Equipment (WEEE) Directive 2012/19/EU. GS1 data matrix type barcode containing detailed product information. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 12: Connections

    6.1 General overview Figure 2 - Front view Figure 3 - Rear view Figure 4 - Top view MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 13: Detailed Connection Overview

    Table 4 - Circular M12 connector with 5 positions A-coded details Description Connector view Shield CAN-H CAN-L MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 14: External Power Connector

    Specifications Power supply input 12 … 58 V Not fitted Power supply return connection No connection MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 15: Operation

    Energy Monitor. From the factory, the monitor will use minimal start as the start screen. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 16: Expanded Start

    MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 17: Settings

    MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 18: Status Icons

    Portal connection failed Full synchronisation detected Synchronising with the system failed Developer mode unlocked Demo mode enabled MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 19: Using The Touchscreen

    Clicking this button will show a page where more information will be available. Icons indicating which one of the main pages the user is looking at. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 20: Installation

    1. Make a cut-out in the panel were the Energy Monitor is to be mounted. The size of the cut- out should be 96 mm width and 61.5 mm height. See MG Energy Systems website for Energy Monitor panel mount cut-out.
  • Page 21 4. Place the mounting strips back on the rear of the device and tighten each set of screws till the mounting strips are just flexing slightly. Do not over tighten. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 22: Electrical Connection Procedure

    Master HV an termination resistor is already installed internally on the port that should be used for the Energy Monitor. Figure 10 - MG Master LV daisy chain MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 23 Connection of the CAN-bus cable connectors or termination resistor is done in the following way: 1. Locate the key in both connectors. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 24 3. Lock the connector by rotating the locking nut clockwise. Hand-tightened will be sufficient, do not use tooling to tighten. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 25: External Power Supply Connection

    Make sure the voltage applied to the external power connector is in the range listed in the technical specifications (see section 10). MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 26: Service

    The working of the touchscreen will be impaired if the screen is wet, please dry before usage. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 27: Updating

    8. The Energy Monitor will shut-down and perform the firmware update. 9. When the update was successful, the monitor will start-up automatically. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 28: Technical Specifications

    EMC: Emission NEN-EN-IEC 61000-6-3:2007/A1:2011 EMC: Immunity NEN-EN-IEC 61000-6-2:2019 Low voltage directive NEN-EN-IEC 60335-1:2012/A13:2017 RoHs EN 50581:2012 MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 29: Dimensions

    Innovation in energy storage 10.2 Dimensions Unless otherwise mentioned all dimensions are in mm. MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 30: Ordering Information

    M12 CANOpen cable 90 to 90 deg 3m MGM12050001 M12 CANOpen cable 90 to 90 deg 5m MGUSBCAN001 MG USB CAN Interface MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...
  • Page 31: Contact Details

    NL-8914 BH Leeuwarden The Netherlands : www.mgenergysystems.eu e : info@mgenergysystems.eu : +31 (0) 58 750 89 47 MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands +31 (0)58 750 89 47 | info@mgenergysystems.eu | www.mgenergysystems.eu...

Table of Contents