BL-Series Orchard Blower Table Of Contents Introduction Thank You Warranty Safety Operational Safety Maintenance Safety Installation Installation on LP Version 2 Installation on Sanitizer Installation on LP Version 3 Basic Operation Hook Up Procedure Starting Procedure Running Your Attachment Shut Down Procedure Adjustments &...
Vrisimo Flail Mowers & Shredders is solely owned by Valley Tool and Manufacturing. Have industrial applications? Own a skid steer or mini excavator? For our full line of industrial equipment visit: www.valleytoolmfg.com...
& Mfg. warrants each product to be free from at Valley Tool & Mfg., of Hughson CA, or at a service manufacturing defects, subject to the limitations facility designated by us, or such part or parts as contained in this policy.
Safety Failure to heed any of these warnings may result in Operate at a safe speed (typically 0-5 mph) in personal injury or death. consideration of the local terrain, moving slower when operating on or near slopes, ditches or drop- A.
Safety Operation of this machine should be stopped Maintain all safety decals and make sure they are immediately if the Operator’s vision becomes visible to the operator. If decals are worn, contact obscured by the discharge of debris and dust. Also your nearest Vrisimo dealer for replacements.
Installation Procedure A. Installation on LP Version 2 (2005-2021) 5. Install blower assembly on frame. Place belt 1. Install rear brackets. over blower pulley. 2. Remove yoke from gearbox. 6. Tension belt using 4X jack screws. a. Shorten top shaft by 6” and add a keyway. 7.
Installation Procedure B. Installation on Sanitizer 5. Install blower assembly on frame. Place belt 1. Install rear brackets. over blower pulley. 2. Remove yoke from gearbox. 6. Tension belt using 4X jack screws. a. Shorten top shaft by 6” and add a keyway. 7.
Installation Procedure C. Installation on LP Version 3 (2022+) 5. Install blower assembly on frame. Place belt 1. Install rear brackets. over blower pulley. 2. Remove yoke from gearbox. 6. Tension belt using 4X jack screws. 3. Install frame rails. 7.
Basic Operation A. Hook Up Procedure C. Running Your Attachment 1. Align tractor with implement. Attach lower lift 1. Determine ground speed based on terrain and arms. material being cut. This will typically fall within the 0-5 mph range. 2. Attach upper 3-point arm. Adjust length for desired approach angle.
Adjustments & Maintenance Straight Edge Note: Before performing maintenance, ensure all motion has stopped and that the Power Unit is powered down with ignition key removed. Before working on or underneath the machine, place blocks on both sides of the Power Unit’s tires and underneath both ends of the machine to prevent accidental lowering of the machine.
Decal kits can be obtained from your local Vrisimo dealer. D. Lubrication Valley Tool recommends greasing with NLGI 2 ISO VG460. Any lithium based NLGI Grade 2 grease that is ISO 460 VG and of high quality will work.
Page 14
BL-Series Orchard Blower Parts Book www.vrisimo.com...