Do you have a question about the ZJ Series and is the answer not in the manual?
Questions and answers
Summary of Contents for EVP ZJ Series
Page 1
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com -- ZJ, ZJP Series Roots Vacuum Pump Operating instruction This operating instruction is important to assure pump operated maintained properly, it’s required to read this instruction carefully you start the pump. Kindly forgive that no special notification will be given for future amendment of this manual.
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com Warning & Attention 1.1 Statement These operating instructions form part of the These operating instructions technical documentation of the system, and are exclusive copyright “ SHANGHAI addressed to the person in charge of the plant, VACUUM TECHNOLOGY CO.
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com 2. Survey 2.1 Introduction Roots pump have ZJ series and ZJP series. directly and requires to be used with a As the input pressure is between 6.5-65 Pa, the fore vacuum pump in series connection.
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com Diagram 2 2.3 Usage and model explanation: 2.3.1 Usage: vacuum degassing, vacuum smelting, evaporation, freezing and drying etc. vacuum heat treating etc., in metallurgical industry and can also be used in chemical 2.3.2 Model explanation: industry.,...
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com 4. Operating principle (3) (2) (1) (5) (4) Diagram 3. The pump’s operating principle is shown as impacted on the rotor is brought to an outlet port Diagram 3. When the pump is rotating, the gas in...
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com 5. Installation 5.1. Before installation, checking each part and should be linked between this pump and a fore make sure there have no damaged, and to pump so as to prevent damaging this pump see whether the product is fit to order because of fore pump’s vibration.
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com 6.2. Starting ①Start the fore pump ⑤There is no leakage in the oil –sealed position of a pump’s shaft. ②Open the gas inlet valve of this pump ⑥During the operating, if the temperature rise is ③Open the water cooling valve and start this...
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com Caution: We recommend the vacuum oil is N100 the screw using a gasket which is in a perfect or N62. Make sure the oil level is correct. If condition. the oil level is too low, the bearings and Caution: The oil fill port must be sealed tightly.
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com 7.6.2 Assembling procedure: Checking all the disassembled spare parts adjust the end cover clearance. carefully, change spare parts if damaged. Clean NOTE: Assembling the active/driven gear of parts using petrol, diethyl ether or CCI4.
Page 12
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com Oil level is too high. Drain some oil to reach the correct level. Oil level is too low. Add oil to reach the correct level. Wrong oil has been used. Drain oil and fill in correct lubricant.
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com Motor is connected incorrectly. Connect the motor correctly. Motor fault. After sales service. Pumping speed of the Pump or pump system has a leak. Find and seal the leak. pump is too Overflow valve does not close.
Shanghai EVP Vacuum Technology Co., Ltd. www.evpvacuum.com 8.2 ZJP series pump structure Name Name Name Pump body Oil shedding plate A Bearing Side cover A Oil shedding plate B Bearing Side cover B Bearing cove Coupling End cover A Locknut...
Need help?
Do you have a question about the ZJ Series and is the answer not in the manual?
Questions and answers