Document Number: 009-2222-01 Document Date: December 2022 Document Supports: da Vinci 10.1 or higher This document guides the installer through the process of wiring and configuring Savant Power System, and supports the following products: – PKG-ESS600A-SOLARK36-HG76 – PKG-ESS400A-SOLARK24-HG38 – PKG-ESS200A-SOLARK12-HG19-NA –...
All safety instructions below must be read, understood, and carefully followed that each dealer, integrator, installer, etc. access and read all relevant technical under all applicable circumstances when working with any Savant equipment. documentation. Savant Power technical documentation can be located Follow all input power ratings marked on product near power input! by visiting Savantpower.com.
Before You Begin Read this document in its entirety before starting deployment of any product listed within. The following is the items relevant to a Savant Power System installation. IMPORTANT!: Unless stated otherwise, all items listed in the Planning and Savant subsections of this checklist are required. All third party equipment...
4. ASCO Automatic Transfer Switch (Recommended) An ASCO ATS is recommended, but not required to be installed to allow the system to switch between using and not using the Sol-Ark inverters automatically. 4.1. Overview Live Load Terminals Emergency Source Terminal...
Page 7
Once the ATS is confirmed to be fully functional, use the interface on the front of the enclosure to set the parameters for ATS. ATS parameters are listed in Appendix B: ASCO ATS Parameters. Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 7 -...
Page 8
200A Battery Breaker Ground Bus Bar Communication Ports Generator Terminal Blocks Battery Sensor Inputs Load Terminal Blocks 200A Load Breaker Grid Terminal Blocks Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 8 -...
Page 9
Grid L1 & L2 Terminals Battery Terminals Generator L1 & L2 Terminals Communication Ports Load L1 & L2 Terminals Battery Temp, CT, and Generator Control Inputs Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 9 -...
Page 10
5.3. Mounting The mounting location will already be detailed within the Savant Power System Design Guide. To mount the Sol-Ark 12k inverter, follow the steps below: Affix a mounting board to studs using 6-8 screws. Use multiple screws and washers to mount the French Cleat to the board or wall.
Page 11
Wire all batteries through a DC combiner bus bar. Wire the combiner into the battery terminals on the Sol-Ark inverter. The image below uses the Sol-Ark 15k as an example, but the wiring is the same on the 12k, but with different battery terminal locations. IMPORTANT NOTES!: –...
Page 12
5.6. Battery Sensor and Accessory Placement Next, wire the battery sensors from the installed batteries to the Battery Sensor inputs on the Sol-Ark inverter. 9 10 11 12 13 14 15 16 Sensor Pin Polarity Name Batt Temp Sensor has no polarity and is used for voltage correction when using Battery Temperature lead acid batteries.
Page 13
Panel Panel IMPORTANT!: – Sol-Ark has triple MPPTs for three separate PV input pairs. – If using Y-Connectors, run two strings in parallel, totaling 26A (self-limiting) – Maximum PV input is 19.5kW (± 5%) / system | 6.5kW / MPPT | MAX 500VOC PV | MAX ISC /MPPT 26A (limiting to 26A) –...
Page 14
– Panel frame grounding can be done to any ground in the home. Mounts usually bond frames together, so only one ground wire is needed. Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222...
Page 15
– For more information on creating a plant, see the Sol-Ark Man- ual Remote Monitoring Setup section. Parameters The parameters of the Sol-Ark inverter must be set manually according to the equipment installed onsite.
Page 16
Remove the top and side covers of the BMS. To the bottom right is an example with four battery modules. Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222...
Invert COMM Ark inverter. 1 2 3 4 5 6 Connect the communication cable to the ports detailed in section 5.8 Communication. Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 17 -...
Page 18
Mount the fixing in the middle of the left-hand side of the system as shown to the right. Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 18 -...
Flashing (1s on, 1s off): Connected to Wifi, no connection to Button HomeGrid server. RS232 Port OFF: Normal behavior. Blue Fast Blink (0.2s on, 0.2 off): Upgrading firmware. CANBUS/RS485 Port Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 19 -...
Page 20
IMPORTANT!: For information on upgrading the firmware +12VIN -12VIN of the Skybox, see the Skybox Firmware Upgrade Guide on the Power Savant Community. Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 20 -...
4. Connect the RS232 port of the Inverter Communication Cable (Sol- PD1PD2 Ark) to the RS232 port of the Savant Controller. To the right is an example wiring configuration. Parallel Inverters: Connect the male end of each adapter cable to each subordinate inverter.
Savant Power & Light App Deployment Guide on the Savant Community. NOTE: For systems not using a Director or the Savant Power & Light app, follow section 7.3 Companion Modules Pairing to PBC - RDM Tab in the Panel Bridge Controller and Dimming-Relay Module Deployment Guide.
CONFIGURED CHANNEL B Complete Configuration At this point in the configuration, all physical installation has been completed. No further steps are required unless integrating the Savant Power System into a larger Savant system or configuring Energy Scenes. – IMPORTANT!: To integrate the Savant Power System into a larger Savant System, switch all Power Modules into AUTO mode. Then follow the steps listed in the Savant Power Integration Guide on the Savant Knowledgebase.
Page 24
Waiting for Normal Feature 31F time source to return delay, if used Feature 31M time Electrical loads delay, if used switched to emergency source Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 24 -...
IMPORTANT!: This section is informational only. The settings in this section are example parameters using a single ATS for a single inverter for a 200A service. Ensure all settings are configured according to the equipment onsite and the approved three line diagram designed in the Savant Power System Design Guide.
Page 26
0 to 3 sec Inphase Fail accept failure to accept 0 to 6 sec E Accept Fail maximum Emergency source alarm see NOTICE below Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 26 -...
Page 27
Device Adress (Dev Addr) Communication - RS485 Port (optional Accessory 11BE) Protocol Modbus Emulate Grp1 Language English Contrast Display Baclight Volt Label Vab/bc/ca Source 1/2 Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 27 -...
Page 28
Output contact OP2 (select one) Not In Auto Feature 31 Relay Expansion Module Common Alarm Output contact OP3 (select one) Not In Auto Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 28 -...
Appendix C: Sol-Ark Parameters Sol-Ark Menu Tree The parameters of the Sol-Ark inverter are set within of menus, separated into the decision tree listed below: Brightness Beep AM/PM Seasons Auto Dim Time Sync Hour Year Minute Display Solar Arc Fault On...
Page 30
IMPORTANT!: This section is informational only. The settings in this section are example parameters using a single ATS for a single inverter for a 200A service. Ensure all settings are configured according to the equipment onsite and the approved three line diagram designed in the Savant Power System Design Guide.
Page 31
LF1 Time (0-300S) LF2 Time (0-300S) 0.16 Q(V) Normal Ramp rate(1-100%/s) Soft Start Ramp rate(1-100%/s) DC 1 for WindTurbine DC 2 for WindTurbine Savant Power System Deployment Guide - Sol-Ark Copyright 2022 Savant Systems, Inc 009-2222-01 | 121222 - 31 -...
The Savant Power System requires communication between the Sol-Ark Inverter and the Savant Director using the V2 Y Cable described in the Communication part of section 8 Savant. However, when custom wiring considerations are required, it is possible to create a custom Y Cable using standard CAT5 cabling. Use the Parent diagram for the Parent Sol-Ark inverter and the Child Diagram for any additional Sol-Ark inverters.
Page 33
Savant Systems, Inc. shall not be liable for any technical or editorial errors or omissions contained herein or for incidental or consequential damages resulting from the performance, furnishing, reliance on, or use of this material.
Need help?
Do you have a question about the Sol-Ark and is the answer not in the manual?
Questions and answers