Camina GO-Line S21 Installation & Operating Manual

Camina GO-Line S21 Installation & Operating Manual

Heat storage system

Advertisement

Quick Links

S21 GO-Line
Heat storage system
Mehrfach ausgezeichnete Qualität!
Made in Germany
S21 GO-Line with rear connection
Surface finishing: Camina Silicate coating

Advertisement

Table of Contents
loading

Summary of Contents for Camina GO-Line S21

  • Page 1 S21 GO-Line with rear connection Surface finishing: Camina Silicate coating S21 GO-Line Heat storage system Mehrfach ausgezeichnete Qualität! Made in Germany...
  • Page 2 Overview 1. Explanation of Symbols 10. Fuels 10.1 Permissible fuels 2. Safety Information 10.1.1 Logs 2.1 Information on these instructions 10.1.2 Pressed wooden pellets 2.2 General Safety Instructions 10.2 Impermissible fuels 3. Information on fireplace 10.2.1 Impermissible due to design 3.1 Proper use 10.2.2 Impermissible according to the 1st 3.1.1 Using masonry stove...
  • Page 3: Explanation Of Symbols

    All technical documents of the heating insert and all for fireplaces installed incorrectly or differently. Nor accessory parts required for safe operation of the shall Camina assume any liability for mistakes, printing fireplace shall be handed over to the end user and errors and changes.
  • Page 4 WARNING: Danger of injury during transport and Standards and guidelines installation! When connecting and operating the fireplace, the There is danger of injury when transporting heavy loads local, fire safety and building codes, the applicable and/or due to improper securing during transport! Never engineering regulations and standards apply: endanger yourself or others.
  • Page 5 WARNING: Danger of explosion! Procedure and behaviour in case of a Do not bring explosive or combustible materials near chimney fire! the fireplace when it is in operation. Never put yourself or others in a life-threatening Do not store explosive or combustible materials near situation.
  • Page 6: Product Information

    Materials and components (construction materials) You can request this declaration of performance for must be suitable for their intended purpose and the product from: Camina & Schmid Feuerdesign und marked accordance with the district building code. The Technik GmbH & Co. KG, Gewerbepark 18,...
  • Page 7: Chimney Design

    class A 1 according to DIN 4102 Part 1, with an upper The minimum area of the chimney cross-section may application temperature of at least 700° C (testing not be less than 100 cm². according to DIN EN 14303). An insulation code The chimney must dissipate the flue gases with (according to AGI-Q 132) is required, which sufficient reliability and must build up the necessary...
  • Page 8: Combustion Air Supply

    Walls, floors and ceilings, as well as mounted parts  and chimneys of the structure to be protected must be insulated/protected so that no temperatures higher than according to the district building code, generally 85° C, occur. Related ordinances (e.g. Ordinance on Firing ...
  • Page 9: General Information

    6. General Information Mount the opening of the combustion air supply in the same pressure area as the exhaust-gas chimney opening if possible. The combustion air lines must be provided with heat insulation to avoid heat bridges and condensation. Prior to installation, check all components for completeness and any transport damage! Before beginning work, completely lay out all individual parts of the system and check them for damage with a visual...
  • Page 10: Installation

    6.4 Surface design Camina is not liable for improper installation or operation. Adhere to the country-specific, regional and local regulations, e.g. on: •...
  • Page 11: Surface Condition

    You can request a spare parts out the joints with joint scrapers, then remove the shipment from your Camina trading partner. Parts with remaining material and dust and fill the joint again with major damage which cannot be repaired with the filler acrylic.
  • Page 12: Operation And Handling

    important to use cleaning and sealing agents approved 7.2 Heating for cleaning and sealing natural stone, slate and design WARNING: WARNING: Life-threatening danger of concrete. Specialized retailers will advise you on the poisoning! various products for surface treatment and cleaning. An insufficient supply of air and/or evacuation of exhaust gas can lead to dangerous escape of 7.
  • Page 13 7.3 Heating in spring and autumn 8.1 Behaviour in case of a malfunction in heating operation In the spring and autumn, i.e. at higher outside temperatures, fluctuations in the chimney draft can Proceed according to the instructions for your fireplace occur in case of a sudden temperature increase, resulting insert if a malfunction occurs! Shut down the entire in the fuel gas not being completely drawn off.
  • Page 14 9. Transport 10. Fuels Permissible fuels WARNING: Danger of crushing! Stoves and their accessory parts are very heavy. There is danger of injury when carrying heavy loads and/or due Logs: to improper securing during transport! (natural wood, air-dried, max. moisture content 20 %, Lift and carry the components with a sufficient number Fig.
  • Page 15 10.1.2 Pressed wooden pellets other conditions for safe, proper use must be ensured. If Pressed wooden pellets can be of greatly differing necessary, additional documents of other manufacturers quality. Use pressed pellets of natural wood according must be observed for commissioning. to DIN 51731.
  • Page 16 not begin heating until the fuel has nearly burned down completely. Use the maximum combustion air setting (cold start/heat-up). Carefully wipe off any condensation which forms on the masonry stove or on the cladding immediately before residues can burn into the surface coating.
  • Page 17 Allgemeintoleranz Beschreibung mleipner Erstellt 26.02.2019 ISO 2768-m S21 GO-Line Geprüft Schweißtoleranz DIN ISO 13920-B Material Werkstückkanten Camina & Schmid Erstverwendung DIN ISO 13715 Zeichn.-Nr. Feuerdesign und Technik Oberfläche Artikelstamm GmbH & Co. KG www.camina-schmid.de Kopie von BIS-006165 BIS-006177 Status Maßstab...
  • Page 18 26.02.2019 ISO 2768-m DIN ISO 13920-B Material S21 GO-Line Geprüft Front view Lateral view Schweißtoleranz Werkstückkanten DIN ISO 13920-B Camina & Schmid DIN ISO 13715 Erstverwendung Material Oberfläche Zeichn.-Nr. Feuerdesign und Technik Werkstückkanten Artikelstamm Camina & Schmid Erstverwendung DIN ISO 13715 GmbH &...
  • Page 19 15. Exploded views of S21 GO-Line heat storage system 15.1 External cladding and masonry stove of S21 GO-Line heat storage system 15.2 Installation part set for ceiling connection 15.3 Installation part set for wall connection...
  • Page 20: Delivery Scope

    16. Delivery Scope 17. Required materials Contained in delivery scope: Required materials: • • Small installation accessories Tape measure • Repair compound • Angle • • Acrylic adhesive/natural stone adhesive Level • System parts • Spatula • • Installation and operating instructions Container for mixing repair compound •...
  • Page 21 3. Place the rear base on the floor panel without 4. Remove the upper fire clay ring and lay aside. gluing. 5. Now remove the interior lining from the Ronda GO. 6. Remove the fire clay retaining ring on both sides with a 10 mm spanner and lay the outer fire clay sleeve aside! 7.
  • Page 22 9. Push the door section upwards with the tensioning 10. Lift the door and pull it away downward out of the spanner until the pin protrudes from the lower upper pin. Lay the door aside! opening in the door frame. 11.
  • Page 23 285 mm 15..and adjust it to a height of 285 mm using the 16. Mount the combustion air supply (flexible hose, adjustment screws from the upper edge of the floor Ø 125 mm) with the quick-action clamp on the panel up to the lower edge of the body.
  • Page 24 4 mm 4 mm 4 mm 21. Place the front base on the floor panel without 22. Mount the door frame again at the specified gluing. position with the M 6 x 10 screw and align the body evenly. 23. Place the right and left-hand side panels on the 24.
  • Page 25 27. Place the sealing cord in the groove of the upper 28. Lay on the first fire clay ring. Align the installation fire clay ring. guide line on the fire clay ring exactly with the installation guide line on the lower fire clay ring. (Only for wall connection).
  • Page 26 30. Now place on the second fire clay ring evenly... 31..and adjust the rotary chimney by turning. The edge line of the transitions must lie over each other (see arrow). 32. Place on the third fire clay ring and adjust the rotary 33.
  • Page 27 The further installation steps differ for the S21 GO-Line heat storage system wall and ceiling connection variant and are described in the following chapters. 18.2 Continuation of installation of S21 GO-Line with wall connection 35. Place on the fifth fire clay ring with the connection 36.
  • Page 28 Installing poppet valve (option) Installation is only necessary if the required supply air must be taken from the installation room! 40. First the distance from the inner plate is preset 41. Press the installation frame into the Ø 125 mm to 40 mm and locked .
  • Page 29 We recommend sealing all connecting joints with To obtain a fine-grained surface, mix some of the re- acrylic adhesive and coating the entire system. Suita- pair compound into the paint. If necessary, then paint ble paints are, for example, indoor silicate paints (e.g. over the system again only with paint.
  • Page 30 Installing poppet valve (option) Installation is only necessary if the required supply air must be taken from the installation room! 49. First the distance from the inner plate is preset to 50. Press the installation frame into the Ø 125 mm 40 mm and locked .
  • Page 31 55. Refit all parts with acrylic adhesive and lay the inner 56. Carefully lay on the ceiling plate and align. ceiling plate (40 mm Vermiculite) in the system from above. 57. Connection openings not required on the back side are closed off by gluing in the corresponding cover! We recommend sealing all connecting joints with acrylic adhesive and coating the entire system.
  • Page 32 58. Remount the air adjustment lever with the screws. 59. Remount the lower air deflector panel. 60. Remount the door in the reverse order (see Photo 8-11).
  • Page 33: Safety Instructions For Operation

    19. Service dry wood to fill your masonry stove. Clean combustion is only achieved with a sufficient supply of oxygen and 19.1 Safety instructions for operation compliance with the combustion temperature. Combustion starts with little smoke and lasts longer WARNING: Life-threatening danger due to when it takes place from top to bottom (ignite top layer).
  • Page 34 WARNING: Danger of fire caused by combusted gases can form. When opening the filling ignition flame or deflagration door, the sudden supply of air can trigger a deflagration! Never use liquid fuels, such as spirit, petrol, oil or other Smoke and flames can exit when the combustion chamber flammable liquids! Use paraffin igniters or other igniting door is opened during combustion.
  • Page 35 19.2.5 Following combustion When combustion has ended and no fuel has been  added, set the rotary handle to the "Closed" position. This prevents the stove system and the living rooms from cooling via the chimney. 19.2.6 Disposing of ashes after combustion 3: Ember phase Stage Set the rotary handle to "Reduced nominal heat...
  • Page 36 19.4 Care, maintenance, operating breaks CAUTION: Danger of burns caused by hot system parts! Allow the stove system to cool down before performing any cleaning or maintenance work. If the masonry stove is not operating, all doors and adjustment devices must be closed. Clean and perform maintenance on the masonry stove at regular intervals.
  • Page 37 19.5 Environmental protection and disposal Paint damage 19.5.1 Environmental protection Touch up paint damage with stove lacquer. For larger damage, use spray lacquer. Ask your dealer about When used properly, the masonry stoves meet the Schmid stove lacquer or purchase it at the website: flue gas values/emission values of the 2nd Stage the http://ersatzteile.schmid.st 1st German Federal Emission Protection Ordinance...
  • Page 38 20. Log table, heating values Recommended filling quantity Heat storage system S21 GO-Line Max. log length [cm] Max. residual moisture content Recommended filling quantity [kg]* 1 x 7,5 kg** * All kg specifications are approx. specifications! ** Max. filling quantity within 12 hours! Heating value chart Using the chart, the heating value in kWh/kg (based on 20% residual moisture content) can be determined for the firewood used most often.
  • Page 39: Technical Specifications

    21. Technical specifications 21.1 Label type...
  • Page 40 21.2 Dimensional diagram Ronda GO 4557 with rear connection...
  • Page 41 21.3 Dimensional diagram Ronda GO 4557 with top connection...
  • Page 42 22. Parts list for S21 GO heat storage system (for reorders) Quantity Designation Ceiling plate Insulating panel Fireplace connection cover Hood section Upper section Side panel, left Side panel, right Base, front Base, rear Insert for floor panel Remarks: Fax: +49 (0) 5402 - 70 10 70...
  • Page 43 Quantity Designation Floor panel Sealing cord for first fire clay ring Inlay cover, bottom centre Fire clay ring 2 Fire clay ring 2 only for ceiling connection Fire clay ring 3 only for wall connection Fire clay ring 4 only for wall connection Fire clay ring 5 only for ceiling connection Ceramic tape Repair compound...
  • Page 44: General Warranty Conditions

    23. General warranty conditions 5 years Cast metal-masonry stoves 5 years Masonry-stove combustion chambers According to current state of technology, this product 5 years Inset stoves, fireplace cassettes is an innovative, Germany quality product made by 2 years Boiler systems Schmid.
  • Page 45 An expert is a person with extensive theoretical and and Conditions, which can be viewed at practical knowledge and experience in the field of work www.camina-schmid.de. and a knowledge of the relevant standards. Fireplace A fireplace is a technical device for generating heat through combustion of suitable fuels.
  • Page 46: Return Line

    Nominal heat output/Nominal heating or deactivated. capacity Combustion air line The nominal heat output is the heat energy given off per The combustion air line is the component that routes unit of time when the fireplace is operated according to the combustion air to the fireplace.
  • Page 47: Commissioning Report

    25. Commissioning report Commissioning report Page 1 plant operator specialist surname surname address address postcode / location postcode / town Facility data Basic stove combustion fireplace insert device type heating insert chamber serial number marking Schmid AB-number Type downstream connection coasters length ceramic flue gas ducts...
  • Page 48 Heat storage-stone fi replaces The storage stone from Camina is a rein- forced casting compound that still stores and gently gives off the radiated heat of the fi replace for many hours after com- bustion. The systems are easy to install and can be removed again quickly when moving or in case of a desired design change.

Table of Contents