Download Print this page

Installation; Maintenance; Warranty - Eastbrook RIVASSA Installation Manual

2-3-4 column radiator

Advertisement

CONGRATULATIONS
You are the proud owner of an exclusive Rivassa Column Radiator which has been specially produced by
our craftsmen who would wish you to enjoy many years of satisfaction from it.

INSTALLATION

This product must be installed by a fully qualified engineer.
Please consider using an Eastbrook Valve Set – this will ensure that your radiator looks its best
with matching radiator valves.
On commissioning, flush the central heating system thoroughly using a proprietary solution to
ensure that aggressive substances such as fluxes and manufacturing residue, from which internal
surfaces of your radiator can sustain irreparable damage – are removed. It is further
recommended that an appropriately approved corrosion inhibitor be subsequently added to the
heating system in order to protect the radiator and other parts of the central heating system to
promote extended operating lifespan.

MAINTENANCE

From time to time it is advisable to clean your towel rail with a warm damp cloth. Never use any
form of abrasive cleaner or chemical.
Corrosion inhibitor must also be regularly maintained, please consult your engineer for details.
IMPORTANT
Maximum working pressure of this radiator is 4 bar.
Rivassa Column Radiator is not suitable for use on direct central heating systems. Please consult your
engineer or supplier.

WARRANTY

Your Rivassa Column Radiator is fully warranted for five years in respect of defective materials and
workmanship and subject to installation being carried out by a qualified engineer in accordance with
good practice and corrosion inhibitors being regularly maintained.
REMEMBER ...... Excellence is worth looking after.
HELPLINE
Phone : 01452 317890
HELPLINE
email : technical@eastbrookco.com

Advertisement

loading