Download Print this page

Advertisement

Quick Links

Caddon Lynns, Caddon Foot Road, Clovenfords, Galashiels, Scotland, TD1 3LY
Thank you for purchasing this WBC hive. Please read the following brief notes to assist with the
assembly of these hives. For the beginner, this may take 4 hours.
Use a wood glue at every joint for an even stronger long lasting joint
Except for the lifts, insert nails / pins at an angle for extra strength
KEEP CHECKING FOR SQUARE (The diagonal lengths should be the same)
Crown Board
2 x Super Box
2 x Lift
Lift with Porch
Queen Excluder
Brood Box
Open Mesh Floor
5
Nails 30mm
Long pins 50mm
Short Pins 30mm
Screws 40mm
Panel Pins 15mm
Caddon Hives
Tel: 01896 850249 / 755
Email: caddon_hives@yahoo.co.uk
www.caddon-hives.co.uk
WBC Assembly
instructions
Roof
Floor
-
18
25
16
2
Page 1 of 3 Jan 2013
Roof
Porch
Lift (ea)
32
-
12
-
-
4
12
2
8
-
Brood /
Super (ea)
12
-
-
8
16
28
-
-
-
-

Advertisement

loading

Summary of Contents for Caddon Hives WBC

  • Page 1 WBC Assembly instructions Thank you for purchasing this WBC hive. Please read the following brief notes to assist with the assembly of these hives. For the beginner, this may take 4 hours. Use a wood glue at every joint for an even stronger long lasting joint...
  • Page 2 Caddon Hives Varroa Floor This is achieved in four stages: BH048(X1) Stage 1 Start with making the frame Parts 30, 31, • 32, 48. Secure with short pins. (Check for BH031 (X1) square) Slide in the cross member 38. Secure with BH030 (X1) •...
  • Page 3 Caddon Hives Roof Start with making the frame Parts 02(x2) • BH049 (X1) & 03(x2). Secure with long pins. (Check for square) BH002 (X2) Place roofs 01 onto frame, locating 02 • BH001 (X2) into the grooves. Secure with screws...