Table of Contents

Advertisement

SpecTRON
45
Installation, Operation Manual
Document No: 10051285
siemens-energy.com
Unrestricted

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SpecTRON 45 and is the answer not in the manual?

Questions and answers

Summary of Contents for Siemens Energy SpecTRON 45

  • Page 1 SpecTRON Installation, Operation Manual Document No: 10051285 siemens-energy.com Unrestricted...
  • Page 2 Page: 2 of 56 Foreword Thank you for purchasing a Siemens Energy SpecTRON 45 product. The information that follows is an overview of the protection, storage, shipment, unpacking, deployment, and maintenance instructions for SpecTRON 45 products. Siemens Energy recommend the termination and installation of all equipment only be undertaken by suitably trained and qualified personnel.
  • Page 3: Table Of Contents

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 3 of 56 Contents PRODUCT SCOPE .................... 6 1.1 Permeguard™ Wet Mate Receptacle Connector ........6 1.2 Product Certification ................6 1.3 Contact details ..................6 1.4 Product advice label ................7 1.5 Product marking ..................
  • Page 4 Table 7 - Troubleshooting product contact details ............51 Illustrations Figure 1 - Product Advice Label ..................7 Figure 2 - Example Etching for SpecTRON 45 Products ............. 8 Figure 3 - Example harness marking ................. 8 Figure 4 - SpecTRON 45 Rated Current Curves ..............16 Figure 5 - Definition of misalignment directions .............
  • Page 5 (outside UTA) 39 Figure 20 - Umbilical clamping position ................40 Figure 21 - SpecTRON 45 Test Jumper Configurations (without protective caps) .... 46 Figure 22 - SpecTRON 45 Test Termination Support and HV Clearances ......47 Figure 23 - Disassembled receptacle protective cap ............52 Figure 24 –...
  • Page 6: Product Scope

    SpecTRON 45 Common Module Interface SpecTRON 45 Shallow Water/Test Jumpers Permeguard™ Wet Mate Receptacle Connector SpecTRON 45 wet mate receptacle connectors use Siemens Energy’s Permeguard™ wet mate receptacle connector to provide industry leading robustness and reliability by preventing direct seawater contact with insulation.
  • Page 7: Product Advice Label

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 7 of 56 Product advice label The following product advice label is supplied with all Siemens Energy subsea connector products. Figure 1 - Product Advice Label Unrestricted...
  • Page 8: Product Marking

    Connectors and Penetrators Figure 2 - Example Etching for SpecTRON 45 Products Siemens Energy SpecTRON 45 connectors and penetrators are laser marked on the gland body with the Siemens Energy part number, unique serial number, and product rating information. Additionally, connector front-ends are also marked with their part number and unique serial number to aid traceability during manufacturing.
  • Page 9: Product Safety

    Revision: Page: 9 of 56 PRODUCT SAFETY Siemens Energy Subsea recommends the termination of all equipment shall only be undertaken by trained, suitably qualified and experienced personnel (SQEP) i.e. competent person. Action-related warnings Classification of action-related warnings The action related warnings are classified in accordance with the severity of the possible danger using...
  • Page 10: General Safety Information

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 10 of 56 General safety information 2.3.1 Installation by competent persons only The installation, inspection, maintenance and repair of the product shall be undertaken by trained, suitably qualified and experienced personnel (SQEP) i.e. competent person, to carry out a specified activity.
  • Page 11 Danger! Risk of imminent danger to life, risk of severe personal injury caused by released pressure and or projectile due to incorrectly installed pressure retaining product, e.g. during system pressure test (e.g. SpecTRON 45 penetrator fitted with wrong/insufficient screws or seals).
  • Page 12 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 12 of 56 Warning. Risk of eye/bodily injury caused by released pressure during product disassembly, in the event of retrieval from subsea with a fault that causes depth pressure to be trapped inside the product.
  • Page 13: Related Documents

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 13 of 56 Warning. Risk of minor personal injury and material damage due to slips, trips and falls. Good housekeeping avoids slips, trips and falls, keep all work areas clean and tidy. Warning.
  • Page 14: Abbreviations

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 14 of 56 ABBREVIATIONS Ampere Alternating Current Assy Assembly American Petroleum Institute American Wire Gauge Bill of Material °C Degree Celsius Community European Common Module Interface, a penetrator which presents a common interface to a dry- mate gland, regardless of the interface to a customer module Comms Communication Signal...
  • Page 15 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 15 of 56 Standard International Site Installation Test Site Received Test Stainless Steel To Be Defined Twisted Screened Pair Unified Numbering System for Metals and Alloys Volt Unrestricted...
  • Page 16: Specification And Residual Hazards

    16 of 56 SPECIFICATION AND RESIDUAL HAZARDS The following is the typical specification for SpecTRON 45 connectors and penetrators with 630 mm², 26/45(52) kV jumper cable and will differ for connectors terminated to umbilical power cores or internal pigtails, and in other situations. For connector specific information, please refer to product specific datasheets.
  • Page 17: Misalignment Capability Of Wet Mate Connectors

    For any wet mate pair, one connector must be rigidly mounted using a fixed mount kit, and the other half compliantly mounted. Siemens Energy Subsea offer two compliant kits which differ in the amount of compliance they offer. Allowable misalignments are defined relative to the mounting mounts in the plates in the mating/stab tool, rather than the connectors themselves.
  • Page 18: Hose Specifications

    17,0 kg/m Weight in water kg/m Max Length without coupler Hose Coupler Weight in air Hose Coupler Weight in water Table 5 - SpecTRON 45 Hose Specifications Cable Specifications 630 mm² Unit Outside Diameter Minimum Bend Radius Storage Temperature Range -25 to +60 °C...
  • Page 19: Other Specifications

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 19 of 56 Other specifications For all other specifications not included in the above tables, refer to product/project specific data sheet(s), alternatively contact Technical Support connectortechnicalsupport.gb@Siemens- energy.com. Unrestricted...
  • Page 20: Health And Environmental Information

    Officer at subsea.connectors.productsafety.gb@siemens-energy.com. Hazardous substances, Control of substances hazardous to health (COSHH) Assessments regards to materials such as elastomers and oils, etc. used in SpecTRON 45 products are available on request from the Product Safety Officer at subsea.connectors.productsafety.gb@siemens-energy.com. Personal protective equipment (PPE) Personal Protective Equipment (PPE) is legally defined as ‘all equipment (including clothing affording...
  • Page 21: Preparing Product For Use

    625 materials, and as such are designed to withstand harsh saliferous environments. However, the connector inserts and exposed parts are susceptible to mechanical damage if not protected. Dust caps or polyethylene protective caps must be fitted to all Siemens Energy Subsea connectors before transport.
  • Page 22: Safe Disposal Of Packaging

    Figure 2 Protective Caps on SpecTRON 45 The modules below use disposable screws to attach the caps to the connector: Shallow Water Gland (M12 Screws) •...
  • Page 23: Lifting

    The table below shows the most common modules in the SpecTRON 45 product range and their most appropriate lifting points. It is intended as a guide to correct lifting locations and to aide specification of correct lifting equipment (e.g.
  • Page 24 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 24 of 56 Ensure choke is on Shallow Water Gland narrow band of plug with Plug nose Shallow Water Gland with Receptacle Support with soft sling Cable & Hose every 5 m maximum Unrestricted...
  • Page 25: Installation And Assembly

    25 of 56 Installation and assembly The compliant and fixed mounts for the SpecTRON 45 are shipped in the same packaging as the connectors but are not assembled to the connector. The connectors need to be routed to their final installation position before the mounting kit is used to mount the connector to the module panel or mating head.
  • Page 26 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 26 of 56 4. Bring the connector with the arms to the plate. 5. Thread the bobbins onto the arms 6. Secure the bobbins to the mounting plate using 3 socket head cap screws and M12 Nord-Lock washers, tighten to a torque of 100 Nm.
  • Page 27 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 27 of 56 7. Verify that all fasteners are correctly tightened. Danger! Risk of serious personal injury or death, and material damage to product The connector will drop to the lowest position possible when the lifting equipment •...
  • Page 28 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 28 of 56 3. Align the fixed mount segments with the connector flange and attach the fixed mount segments to the connector flange using 5 x M10 screws and Nord-Lock washers. Tighten to a torque of 60 Nm.
  • Page 29 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 29 of 56 6. Verify that all fasteners are correctly tightened before slowly releasing any supports and/or lifting equipment. Unrestricted...
  • Page 30: Storage And Protection

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 30 of 56 Storage and protection Caution. Risk of corrosion to electrical contacts. If the connector has been tested in a wet environment, mate receptacle to a full • dummy plug, or if using a protective cap ensure that the pin and cap are completely dry (see section 6.6.3) If storage is carried out in high humidity or salinity conditions, e.g.
  • Page 31: Repackaging To Prevent Damage In Transport

    Repackaging to prevent damage in transport In the event of a requirement to return any product back to the manufacturer (Siemens Energy Subsea Connectors), it is recommended that the original dust/protective cap is fitted to the connector(s) after cleaning and care should be taken to protect the connector(s) with bubble wrap or similar wrapping materials to avoid any surface damage.
  • Page 32: Operation Of Product

    Receptacles must not be energised unless mated to a plug • SpecTRON 45 connectors should be integrated and managed as part of a well-designed high voltage system with appropriate validation of system status and connections before energisation. When performing high-voltage testing of an electrical system containing SpecTRON 45, Siemens offer appropriate test equipment which can be used to provide safe termination of wet-mate and dry-mate connectors.
  • Page 33: Hose Management And Routing

    The maximum unsupported hose length in water during ROV operations for • SpecTRON 45 harnesses (single and bundled) using AquaTRON 350 hose and 630 mm² cable is 50 m Maximum unsupported horizontal hose length in air and water for SpecTRON 45 •...
  • Page 34: Figure 7 - Incorrectly Routed Aquatron Hose

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 34 of 56 Figure 7 - Incorrectly routed AquaTRON hose Particular efforts should be made to support the hose where it exits the rear of the connector, particularly if the hose is to be routed immediately in an orientation contradictory to the connector (e.g.
  • Page 35: Figure 10 - Plate Former

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 35 of 56 7.3.1 Recommend Hose Former Designs Detailed below are some recommended shapes of former that may be utilised to aid routing of hose during SIT or structure routing (deployment). RECOMENDED FORMER DESIGNS Figure 10 - Plate Former Figure 11 - ‘U’...
  • Page 36: Figure 12 - 'L' Former

    Figure 13 - Permanent fixed ‘U’ former Clamping Siemens Energy recommends that plastic clamps with elastomer insert are used to secure the hose (such as a Stauff pipe clamps with the correct inside diameter, refer to section 4.3 for hose diameters).
  • Page 37: Figure 14 - Minimum Clamp Spacing From Fixed Mount Connector

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 37 of 56 length of the hose to the start of the hose adaptor on a compliant mount connector and 250 mm for a fixed mount connector or penetrator as shown below. Figure 14 - Minimum clamp spacing from fixed mount connector Compliantly mounted connector...
  • Page 38: Figure 17 - Example Of Support For Immediate Fall In Hose Routing

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 38 of 56 The maximum recommended vertical length of hose which can be unsupported (hang) in air is 5 meters, however the MBR of the hose must still be observed at the hose exit of a connector or change from horizontal to vertical orientation before allowing 5m of hose to hang freely.
  • Page 39: Hose Buoyancy Subsea

    39 of 56 Hose Buoyancy Subsea SpecTRON 45 electrical flying leads (harnesses) under or equal to 60m require no buoyancy aids for subsea deployment. SpecTRON 45 electrical flying leads over 60m require buoyancy aids suitable to support 6,9 kg (see section 4.3) per metre length in excess of 60m.
  • Page 40: Figure 20 - Umbilical Clamping Position

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 40 of 56 7.5.2 Clamping Figure 20 - Umbilical clamping position Umbilical cable can be clamped at a minimum of 500 mm in line with the axis of the connector to aid with routing and support.
  • Page 41: Connecting Wet Mate Pair Subsea

    • in compliance with applicable standards and regulations for machinery. The SpecTRON 45 wet mate pair cannot be mated subsea without specialised mating and locking equipment (mating tool). The maximum mate/de-mate speed for the SpecTRON 45 connector is 30 mm/s.
  • Page 42 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 42 of 56 2. Lift the connectors onto the supports 3. Align the two connector halves and engage the plug into the receptacle 4. Use clamps to drive the two connector halves together. When the receptacle hits the plug nose support, remove it.
  • Page 43 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 43 of 56 5. Continue to use the two clamps to draw the connectors together until the mating faces close. 6. Remove the clamps one at a time and replace with the stud iron to clamp the two connector halves together.
  • Page 44 Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 44 of 56 7.7.2 De-mating the connectors 1. Slowly remove the clamping rods, there should be no force pushing the connectors apart. 2. Use the clamps between the lugs to slowly push the connectors apart. 3.
  • Page 45: Quick Connect (Dry Mate)

    This operation should only be carried out by Siemens or other suitability certified personnel in possession of the correct equipment and work instructions. Please contact Siemens Energy Subsea for more information on training, certification and termination services for SpecTRON 45 provided by Siemens Energy Subsea.
  • Page 46: Testing

    7.9.1 Test connectors SpecTRON 45 test connectors are available in configurations to support all interfaces within a project, specifically, plug, receptacle, and dry-mate interfaces as shown in Figure 21. Figure 21 - SpecTRON 45 Test Jumper Configurations (without protective caps)
  • Page 47: Figure 22 - Spectron 45 Test Termination Support And Hv Clearances

    Page: 47 of 56 SpecTRON 45 test connectors are supplied with a heat-shrink cable termination on the free end of the cable, which is sensitive to bending after it has been installed onto the cable. Bending of the test termination should be installed and it should be correctly supported during testing/operation. The...
  • Page 48 Siemens Energy Connectors technical department should be consulted before starting any testing. Partial Discharge Test • o Please consult Siemens Energy Connectors technical department before carrying out partial discharge (PD) testing of harnesses, connectors and penetrators. 7.9.4 Pressure/Hydrostatic Tests Hydrostatic Tests •...
  • Page 49: Disposal Of Waste Products

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 49 of 56 7.10 Disposal of waste products Safe disposal or recycling of waste/end of life product is recommended by correctly, observing and complying with area, regional, national, or international environmental legislation where applicable. To return waste packaging and/or end of life product to the manufacturer, contact the Product Safety Officer at subsea.connectors.productsafety.gb@siemens-energy.com.
  • Page 50: User Information

    Visible oil discharges from connector During normal operation of the SpecTRON 45 wet mate pair, it is normal for a film of oil to be left on the receptacle pin after mating. There may also be some oil residue from assembly left in the compensation volume within the connector which may be visible during initial wetted testing.
  • Page 51: Table 7 - Troubleshooting Product Contact Details

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 51 of 56 Department E-mail address Product Safety subsea.connectors.productsafety.gb@siemens-energy.com Technical Support connectortechnicalsupport.gb@siemens-energy.com Installation and Servicing susultlcmsupport.gb@siemens-energy.com Sales connectorsales.gb@siemens-energy.com Table 7 - Troubleshooting product contact details Unrestricted...
  • Page 52: Product Maintenance

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 52 of 56 PRODUCT MAINTENANCE Danger! Risk of death from electric shock. Connectors must not be de-mated whilst live. • Allow sufficient time for system to discharge any residual voltage to discharge •...
  • Page 53: Figure 24 - Receptacle Components For Drying And Cleaning

    Perform a mate with a Plug connector to lightly coat the receptacle pin in oil. If no plugs are • available contact Siemens Energy for Midel 7131 oil, which can then be applied directly to the pin using a clean, soft lint-free cloth.
  • Page 54: Product Maintenance (Skilled Persons)

    If performing this operation topside, rinse the connector with water when complete. • To remove calcareous growth from Siemens Energy Subsea connectors, a solution of 50% Citric Acid is recommended. All seawater exposed elastomeric materials in Siemens Energy Subsea connectors have been fully tested against 50% Citric Acid and are compatible for a duration of 1 hour.
  • Page 55: Customer Comments/Feedback

    Document No: 10051285 Issue Date: 22/10/2021 Revision: Page: 55 of 56 CUSTOMER COMMENTS/FEEDBACK Please complete the Sign Off section at the bottom of form to confirm each page of this document has been read and complied with in full. Originator Name and Initials (BLOCK CAPITALS) Date ...
  • Page 56 The requested performance features are binding only when they are expressly agreed upon in the concluded contract. Siemens Energy is a trademark licensed by Siemens AG. Unrestricted...

Table of Contents