Page 1
2. Position bungees behind the 2nd, 4th, 6th and 8th grommets (Bungee’s are used to roll tarp up when not in use) Winnwell Inc., 3044 Bloor Street West, Suite 309, Toronto, Ontario, M8X 2Y8, Canada Winnwell s.r.o., Chvalova 7, Praha 13000, Czech Republic 1 877 736 6433 winnwell.ca...
Page 2
6*. If installing in front of a wall there should be a 12" buffer zone to avoid damage to the wall Winnwell Inc., 3044 Bloor Street West, Suite 309, Toronto, Ontario, M8X 2Y8, Canada Winnwell s.r.o., Chvalova 7, Praha 13000, Czech Republic 1 877 736 6433 winnwell.ca...
Page 3
3. Attach three hook screws (not included) to the 2x4 and hang from the ceiling using rope, cable or chain (not included) Winnwell Inc., 3044 Bloor Street West, Suite 309, Toronto, Ontario, M8X 2Y8, Canada Winnwell s.r.o., Chvalova 7, Praha 13000, Czech Republic 1 877 736 6433 winnwell.ca...
Need help?
Do you have a question about the TG96ST55 and is the answer not in the manual?
Questions and answers