Download Print this page

Advertisement

Quick Links

Val-C12-2400G Chassis
Installation Guide
HOW TO INSTALL VALKYRIE TEST MODULES
Version 5.1
Xena Networks ApS
Gammel Lundtoftevej 1B, 2
nd
floor
2800 KGS Lyngby
Denmark
www.xenanetworks.com
© Xena Networks – May 2022
1

Advertisement

loading

Summary of Contents for Xena ValkyrieBay Val-C12-2400G

  • Page 1 Val-C12-2400G Chassis Installation Guide HOW TO INSTALL VALKYRIE TEST MODULES Version 5.1 Xena Networks ApS Gammel Lundtoftevej 1B, 2 floor 2800 KGS Lyngby Denmark www.xenanetworks.com © Xena Networks – May 2022...
  • Page 2: Specifications

    • FCC (US) • CE (Europe) TECH SUPPORT Please contact your local Xena partner or open a support ticket at https://xenanetworks.com/support/ PACKING LIST When you unpack the chassis, make sure the following items is included in the box: • 1 x ValkyrieBay Chassis (Val-C12-2400G) •...
  • Page 3: Quick Overview

    List of test modules not needing separate 12V supply: Odin-1G-3S-6P Odin-1G-3S-6P-E Odin-1G-3S-2P-T Odin-10G-1S-2P-T List of modules needing separate 12V supply: Odin-1G-3S-6P-T1-RJ45 Odin-10G-1S-2P Odin-10G-1S-6P Odin-5G-4S-6P-CU Odin-10G-3S-6P-CU Odin-10G-5S-6P-CU Odin-40G-2S-2P Loki-100G-3S-1P Loki-100G-5S-1P Loki-100G-5S-2P Odin-100G-3S-1P Chi-40G-2S-2P Chi-100G-5S-2P (cont. on next page) © Xena Networks – May 2022...
  • Page 4 Freya-800G-4S-1P-OSFP (special 12V power cable included) Modules marked blue must be removed from chassis and packaged separately before transportation. Always use the original Xena boxes for shipping (including the polystyrene foam and anti-static bags). Recommendations:  For ports that are not in use, keep dust caps mounted.
  • Page 5 The installation steps outlined above are described in detail below. Please refer to the relevant section. STEP 1: Remove the top cover by unscrewing the two finger screws at the back of the chassis. STEP 2: Unscrew the restraining bar. © Xena Networks – May 2022...
  • Page 6 Remove the air flow cover by unscrewing the two finger screws on top and sliding it backwards till it releases STEP 4: Remove the alignment bar by loosening the two finger screws on top. © Xena Networks – May 2022...
  • Page 7 If you are installing a Thor- or Freya module, you would have received the module itself, a blind board, and a special single 12V cable, replacing the 12V splitter cable included with the chassis: © Xena Networks – May 2022...
  • Page 8 You also need to reserve a slot to install blind board on the heat sink side of the module. STEP 6: Slide the module into place and use the screw to secure it. © Xena Networks – May 2022...
  • Page 9 STEP 6 (cont.): Press the test module firmly but carefully into place – do not force it – and then fasten again with the screw from Step 3. © Xena Networks – May 2022...
  • Page 10 Slot 2 - Blind Board Slot 3 - Thor-400G module Slot 5 - Blind Board Slot 6 - Thor-400G module Slot 8 - Blind Board Slot 9 - Thor-400G module Slot 11- Blind Board © Xena Networks – May 2022...
  • Page 11 Step 7 If needed (see list on page 3 and 4), connect 12 V power cable (Use delivered 12V cable) © Xena Networks – May 2022...
  • Page 12 Mount the alignment bar by mounting the two finger screws. The alignment bar fixes the modules in place. Please make sure the top of the module goes into the appropriate slot in the alignment bar. © Xena Networks – May 2022...
  • Page 13 Position the restraining bar in place and screw the restraining bar tightly in place. If sideways adjustments of the modules are necessary, we recommend doing it from right to left (Port 11 to Port 0). © Xena Networks – May 2022...
  • Page 14 STEP 11: Remount top lid and fasten it with the two finger screws (Do not operate the chassis without top lid) © Xena Networks – May 2022...
  • Page 15 © Xena Networks – May 2022...
  • Page 16 To minimize the risk of damage, please remove “long” test modules before transportation. This includes any test module(s) that extend past the metal restraining bar under the chassis lid. Always use the original Xena boxes for shipping (including the polystyrene foam and anti-static bags). © Xena Networks – May 2022...