Air Curtains Table of Contents Basic information ..............Technical Parameters ............. New Air Curtain Planning ............VCP Control Unit ..............Connection Examples ............Installation, Operation and Service ........Packaging, Spare Parts and Disposal ........
Air Curtains Basic Information Energy savings minimizing air flow rates Figure 1 Tabulka 7 Table 1 Slot Speed Airflow rate Input Ratio Unit type Operating conditions ∆ Installation Before installation, familiarize yourself with the Sa- fety Rules on page 12. Construction Description Type identification Figure 2...
Air Curtains Technical Parameters The following tables include important technical parameters of the The exit slit height can be ordered from 2 to 4 m. The reach range of the produced air curtains arranged according to the type of air heating, i.e. air stream changes depending on the selected exit slit height.
Page 6
Air Curtains Air Curtain Designing Nomogram Air velocity in slot (m) Volume of air (m Projecting procedure - detailed explanation of terms and projecting procedure is on page 7 ...
Air Curtains New Air Curtain Planning Air Flow Velocity in the Exit Slit Designing Nomogram Glossary Air Flow Rate (Quantity) Type of Air Heating Necessary Heating Output Orientation and Arrangement of the Air Curtain ∆ 12 m Water Discharge Table 2 Arrangement Range Slot length...
Air Curtains VCP Control Unit VCP control units Operating conditions, position and location Start and stop START - AUTO START AUTO AUTO Construction and materials HEATER DISCONNECTING SWITCH PUMP DISCONNECTING Control and protection VCPE VCPW...
Air Curtains Connection Examples Figure 3 Connection of low temperature unit without heating (N) STD 25 Observe the rules on page 12. main power supply Figure 4 STD 25 technical parameters...
Page 10
Air Curtains Connection Examples Figure 5 Connection of water heated unit (W) VCP-W Observe the rules on page 12. main power supply Figure 6 3-phase fan motor 4B x 1,5...
Page 11
Air Curtains Connection Examples Figure 7 Connection of electric heated unit (E) VCP-E regulation thermostat Observe the rules on page 12. main power supply Figure 8 Electric heater EO 3-phase fan motor...
Air Curtains Installation, Operation and Service Wiring and Safety ons) must be bridged with yellow-green cables or plated copper cords of min. section 4 mm2, provi- When handling, installing, wiring, commissioning, ded with cable tags and fan-shaped washers. repairing or servicing the air curtains, it is necessa- The entire air curtain assembly must be intercon- ry to observe valid safety rules, standards and gene- nected with the VCP control unit by a separate yel-...
Page 13
Air Curtains Installation, Operation and Service Operation, Maintenance and Service Air Curtain Operation Safety Rules Operational Inspections Important note: All precautions concerning electrical accidents must be strictly observed. Any actions restricting sa- fety and/or protective precautions, even temporari- ly, must be strictly avoided. Type Plate By no means may any guards or other safety equipment be removed.
Page 14
Air Curtains Installation, Operation and Service Information and Safety Labels Storage Waste classification Packaging Used packaging: (plastic packaging) Transport and Handling (wooden packaging) Disabled device and its parts: (other items from disabled devices) (dangerous items from disabled devices) Accessories Spare Parts Disposal...
Page 15
Air Curtains Specify the contract: ..........Price DoorMaster type Controller type Accessory Dimensions, weights, outputs Air curtain reach Slot length Height to built in Width Total height Depth Weight Airflow rate m /h Power supply Electric protection Filtration class Air curtain fan Current Power input Air curtain heater...