This Owner's Manual contains instructions on the installation, operation, maintenance and warranty
of the NanaWall FSW75 Folding Frameless System. This manual is to be used by the installer
for installation and is to be kept by the Owner for reference. Replacement parts can be ordered
directly through NanaWall Systems.
Nana Wall Systems, Inc.
100 Meadowcreek Drive #250
Corte Madera, CA 94925
800 873 5673
info@nanawall.com
nanawall.com
415 383 3148
Fax 415 383 0312
©2022 Nana Wall Systems, Inc.

Advertisement

loading

Summary of Contents for NanaWall FSW75

  • Page 1 This Owner’s Manual contains instructions on the installation, operation, maintenance and warranty of the NanaWall FSW75 Folding Frameless System. This manual is to be used by the installer for installation and is to be kept by the Owner for reference. Replacement parts can be ordered directly through NanaWall Systems.
  • Page 2 (GANA) recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass panels. The installation of the FSW75 System requires a working knowledge and experience in the use of tools, equipment The FSW75 system is shipped with all necessary and methods necessary for the installation of aluminum components.
  • Page 3 NANAWALL FSW75 OWNER’S MANUAL DIAGRAM 1: EXAMPLE OF A 5 PANEL UNIT I N S ID E O U TS ID E Panel #1: folding panel Panel #2: folding panel Panel #3: folding panel Panel #4: folding panel Panel #5: single/double action end panel with pivot box or...
  • Page 4 As the FSW75 system is a top-hung system, it is 3. Store in a clean and dry location and protect against essential that a proper substrate with the proper...
  • Page 5: Unit Installation

    NANAWALL FSW75 OWNER’S MANUAL be designed to accommodate the total weight of the 8. Floor sockets, pivot points, and floor closers will need panels (i.e. system weight with 12 mm (1/2") tempered to be installed at precise locations after all panels are glass app.
  • Page 6 The key to having a properly installed and material and construction. If the factory pre-drilled holes operating FSW75 system is to install a perfectly are sufficient, then 8 mm (5/16") diameter screws can be level upper track at the correct height from the used.
  • Page 7 NANAWALL FSW75 OWNER’S MANUAL IMPORTANT: ADJUST EACH ANCHORAGE Step B1 POINT AS NEEDED TO MAKE THE UPPER Check all the carriers on all the folding panels. Make sure TRACK ABSOLUTELY LEVEL AND PLUMB. USE all the locking nuts are securely tight. Do not make any A TRANSIT/LASER AND OTHER SIMILAR PRECISE adjustments on the carriers, yet.
  • Page 8 NANAWALL FSW75 OWNER’S MANUAL Step B5 The bottom track will be supplied in full length. In the area of the single/double action end panel (panel #5) After you inserted all folding panels, secure them in the you have the option of cutting the bottom track short opening.
  • Page 9 NANAWALL FSW75 OWNER’S MANUAL of wall. Mark this dimension on the chalk line. If concrete, 11 mm open jaw wrench and adjust the height. Counter- use a diamond core drill bit with 1 1/4" diameter. Install the clockwise rotation = less floor clearance; clockwise pivot point and if necessary, use suitable material to fix it rotation = more floor clearance.
  • Page 10 NANAWALL FSW75 OWNER’S MANUAL place. Then install the receiver box for the top axle by the end cap and top cover on the inside. Screw the hanging it off on the side of the top track and fix it slightly adjustable bracket onto the threaded bolt of the top axle with the 2 set screws.
  • Page 11: Final Steps

    NANAWALL FSW75 OWNER’S MANUAL The 2 offset pivot brackets are installed on panel #5 Step E3 already. When you start installing this panel, set the Correct any problems before you finish the trimming. Do bottom pivot axle on top of the pivot axle of the floor not attach any trimming directly to the top track.
  • Page 12 Make sure each folding panel is placed in its proper encounter any difficulties in operating the unit, please position in the opening and engage the locking point have it inspected by a NanaWall Certified Installer as before moving the next panel. Do not place your soon as possible.
  • Page 13 8. It is highly recommended that a maintenance/ Locking points should be gently opened and closed service contract be entered with a NanaWall certified and not forced. Panels should be opened and closed installer, who can clean, lubricate and inspect in the proper manner and sequence.
  • Page 14: Maintenance Checklist

    Depending on the model, of each panel widths of all glass panels may not be equal. Ask NanaWall for the glass dimensions. Please note that glass is c. Check if all panel end caps are in place required to be safety glass –...
  • Page 15 May 1, 2022, to be installed in the United States (excluding territories) or Canada. NanaWall shall have no obligation to respond under this Warranty until receipt of proper notice of a claim and an opportunity to respond. Upon notice and confirmation by NanaWall of a condition covered under this Warranty, NanaWall will respond in good faith and in a timely manner as follows: TEN YEAR COVERAGE.
  • Page 16: Additional Service Information

    Screens. For a screen part (excluding the screen mesh) with a material or workmanship issue that substantially impairs the function of the screen, NanaWall will, at its option, (1) ship a replacement screen or (2) upon return by owner, repair the screen without charge.
  • Page 17 This Warranty may only be modified by a writing signed by an officer of NanaWall. Any action taken by NanaWall does not create a new warranty or extend the duration of the original product warranty. A failure by NanaWall to enforce a warranty provision shall not constitute a waiver barring subsequent enforcement.
  • Page 18 • Products or components not supplied by NanaWall; Products that have not been paid for in full; Products ordered in larger sizes or special configurations beyond NanaWall’s published specifications. Product with glass that is heavier than NanaWall specifications;...
  • Page 19 NanaWall Warranty Registration Must be filled out and returned to Nana Wall Systems, Inc., 100 Meadowcreek Drive, Corte Madera, CA 94925 within 30 days from date of purchase of the NanaWall in order for the limited warranty to become effective. ________________________...