dIXEL XB570L Operating And Instruction Manual

dIXEL XB570L Operating And Instruction Manual

Blast chiller

Advertisement

Quick Links

dIXEL
Contents
1. General warning _______________________________________ 1
2. General Features ______________________________________ 1
3. Mounting & Installation__________________________________ 1
4. Electrical Connections __________________________________ 1
5. Connections __________________________________________ 1
6. Frontal panel _________________________________________ 1
7. Front Panel Commands _________________________________ 2
8. How To Select A Cycle. _________________________________ 2
9. How To Start The Selected Cycle. _________________________ 2
11. How to definitively stop the cycle. _________________________ 2
13. How to start a manual defrost. ____________________________ 2
14. How A Cycle Is Done. __________________________________ 2
17. List of parameters______________________________________ 4
18. Printer management____________________________________ 5
19. IV configurable relay. ___________________________________ 5
20. Digital configurable input.________________________________ 5
21. ALARM SIGNALS _____________________________________ 5
22. Technical data ________________________________________ 6
23. Standard Value of the cycles._____________________________ 6
24. Standard Values of the parameters.________________________ 6

1. General warning

1.1
PLEASE READ BEFORE USING THIS MANUAL
This manual is part of the product and should be kept near the
instrument for easy and quick reference.
The instrument shall not be used for purposes different from those
described hereunder. It cannot be used as a safety device.
Check the application limits before proceeding.
1.2
SAFETY PRECAUTIONS
Check the supply voltage is correct before connecting the instrument.
Do not expose to water or moisture: use the controller only within the
operating limits avoiding sudden temperature changes with high
atmospheric humidity to prevent formation of condensation
Warning: disconnect all electrical connections before any kind of
maintenance.
The instrument must not be opened.
In case of failure or faulty operation send the instrument back to the
distributor or to "Dixell s.r.l." (see address) with a detailed description of
the fault.
Consider the maximum current which can be applied to each relay (see
Technical Data).
Ensure that the wires for probes, loads and the power supply are separated
and far enough from each other, without crossing or intertwining.
Fit the probe where it is not accessible by the end user.
In case of applications in industrial environments, the use of mains filters
(our mod. FT1) in parallel with inductive loads could be useful.

2. General Features

The series XB has been created for fast chilling or freezing goods according
to international food safety standards.
There are FOUR types of cycles:
The CYCLES: Cy1, Cy2, Cy3, Cy4 are pre-set according to the most
common cycles used in food - safety applications; the user can select
one of them according to his own requirements and modify it as he
wants.
Any cycle can be manually terminated before the normal.
Any cycle can use the third probe like an "insert probe", it measures the
internal temperature of the product.
During the Cycle there are no defrosts and the fans are always on, a
defrost cycle can be done before any freezing cycle.
The cycle is divided up to 3 phases completely configurable by the user.
Each instrument is provided with an output for remote display XR REP,
which shows the temperature of cabinets or goods.
The XB570L controller is provided with internal real time clock and can
be connected to the XB05PR printer. This means that a report, which
1592006100 XB570L GB r1.0 04.11.2004.doc
Operating and Instructions Manual
XB570L
BLAST CHILLER - QUICK CHILL AND HOLD FUNCTION
includes all the main features of cycle, can be printed: start and end of
the cycle, length of the cycle, logging of the temperature of the cabinet
and goods.
3. Mounting & Installation
Model XB570L is a controller panel mounted, hole dims 150x31 mm, and
fixed with the screws. The ambient working temperature range should be
between 0÷60°C. Avoid locations subject to heavy vibration, corrosive gases
or excessive dirt. The same applies to the probes. Ensure ventilation around
the instrument.

4. Electrical Connections

The instruments are provided with a screw terminal block to connect cables
with a cross section up to 2,5 mm
power supply complies with the instrument's requirements. Separate the
input connection cables from the power supply cables, from the outputs and
the power connections. Do not exceed the maximum current allowed on
each relay, in case of heavier loads use a suitable external relay.
4.1 PROBES CONNECTION
The probes shall be mounted with the bulb upwards to prevent damages due
to casual liquid infiltration. It is recommended to place the thermostat probe
away from air streams to correctly measure the average room temperature.
Place the defrost termination probe among the evaporator fins in the coldest
place, where most ice is formed, far from heaters and from the warmest
place during defrost, to prevent premature defrost termination.

5. Connections

8A
8A
8A
250Vac
250Vac
250Vac
1 2 3 4
5 6 7 8 9 10 11
Alarm/
Def.
AUX
Fan

6. Frontal panel

6.1 MEANING OF THE LEDS'
A series of light points on the front panels is used to monitor the loads
controlled by the instrument. Each LED function is described in the following
table.
LED
MODE
ON
Flashing
ON
Flashing
ON
Flashing
ON
Flashing
ON
AUX
ON
XB570L
2
. Before connecting cables make sure the
12A
250Vac
MAX
20A
12
13 14 15 16
17 18
Supply
Comp
230Vac
1
Aux
3
ACTION
- Compressor enabled
- Programming Phase (flashing with LED
- Anti-short cycle delay enabled
- Fans enabled
- Programming Phase (flashing with LED
- Activation delay active
- Defrost active
- Drip time active
- Freezing cycle or hold mode active
- Instrument temporarily stop
- Alarm signalling
- In "Pr2" indicates the parameter is also present
in "Pr1"
- IV relay enabled
1592006100
XB570L
19
2
4
)
)
1/6

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the XB570L and is the answer not in the manual?

Questions and answers

Martin Folberth
April 14, 2025

Wie kann ic h den Regler auf Werkseinstellung zurücksetzen?

Subscribe to Our Youtube Channel

Summary of Contents for dIXEL XB570L

  • Page 1 3. Mounting & Installation__________________________________ 1 3. Mounting & Installation 4. Electrical Connections __________________________________ 1 Model XB570L is a controller panel mounted, hole dims 150x31 mm, and 5. Connections __________________________________________ 1 fixed with the screws. The ambient working temperature range should be 6.
  • Page 2 NOTE: to pass from a cycle to another one simply push the related key. iS2 (-50÷50°C; 1°C/1°F) Insert probe set point to end the second phase when the temperature measured by the third probe reaches this value the second phase is ended. 1592006100 XB570L GB r1.0 04.11.2004.doc XB570L...
  • Page 3 When the Blast Chiller cycle ends an alarm signal is generated: buzzer duration; tP3: third phase duration. and alarm relay is turned ON, the display shows the message “End” alternating with the room temperature. 1592006100 XB570L GB r1.0 04.11.2004.doc XB570L...
  • Page 4 1592006100 insert probe and the thermostat probe is less than iPd, the selected cycle 15.3.6 “rtC”: clock management (for XB570L only) is made by time. It contains the real time clock parameters: iPtTime delay for the automatic recognition of the insert probe: SEC: seconds (00÷59);...
  • Page 5 18. Printer management enabled, all the loads are switched OFF and the cycle is stopped, “CA” The instrument XB570L can drive the serial printer XB05PR by means of message on the display. When the alarm recovers the controller is the RS232 output. So temperatures measured during a freezing cycle can be placed in stand by mode.
  • Page 6 HdS = OFF 24. Standard Values of the parameters. Lab Description XB570L °C/°F Regulation differential AC Anti-short cycle delay 1c2 Second compressor configuration rPO Thermostat probe calibration EPP Evaporator probe presence EPO Evaporator probe calibration 1592006100 XB570L GB r1.0 04.11.2004.doc XB570L...

Table of Contents