ZEBSBOARDS V4R51 Installation & Use Manual

I/o expansion board

Advertisement

Quick Links

I/O EXPANSION BOARD
INSTALLATION & USE
Firmware V4R51 and Higher
ZEBSBOARDS.COM © 2021

Advertisement

Table of Contents
loading

Summary of Contents for ZEBSBOARDS V4R51

  • Page 1 I/O EXPANSION BOARD INSTALLATION & USE Firmware V4R51 and Higher ZEBSBOARDS.COM © 2021...
  • Page 2: Before You Begin

    BEFORE YOU BEGIN Working with electricity comes with huge risks that should never be taken lightly, safety should always come first. To avoid personal injury, possible damage to equipment or danger of fire, all work on electronic equipment should be conducted following these safety procedures. General Safety Before working on any electronics, consider following these basic safety precautions to help reduce any hazards.
  • Page 3 Static Damage Prevention Static electricity can damage electronic devices and your system. To avoid damage, keep static-sensitive devices in their static-protective bags until you are ready to install them. To reduce the possibility of electrostatic discharge, observe the following precautions: •...
  • Page 4 Table of Contents Kit Includes …...................... Theory of Operation …..................Installation and Connection ................
  • Page 5: Theory Of Operation

    Switch function in the control panel. These Dpad controls can then be used for adding joysticks or 8 specialty buttons in software that supports it. Installation of the plunger requires the Zebsboards V3 (or higher) plunger to be updated to the V4R51 (or higher) firmware for proper operation.
  • Page 6: Installation And Connection

    INSTALLATION AND CONNECTION...
  • Page 7 Prepare the connectorby removing the 2 excess wires (optional):...
  • Page 8 Connect the harness to the Expansion Board: Press down on the spring lock Insert wire fully and release Connect remaining wires...
  • Page 9 Connect the Expansion Board to the plunger Connect to button switches...

Table of Contents