Page 3
Sierra Pillar Shower – CTC105 Parts Identification & Assembly Instructions 1. Locate the Wall Assembly Top Cover (SS-05) and secure to the Wall Assembly (SS-01) with provided screws (Fig.2) SS-01 SS-05 (Fig.2) SS-04 2. Floor Assembly Screw (SS-03) Front Back Floor Supports to (SS-04) Floor Joists using the provided screws.
Page 4
Sierra Pillar Shower – CTC105 Parts Identification & Assembly Instructions 4. Position (SS-01) Shower Wall Assembly centered and flush onto the back of the assembled base. Secure (H4) Angle Brackets to either sid eof the wall assembly with the provided lag screws.