Page 3
Sierra Pillar Shower – CTC105 Parts Identification & Assembly Instructions 1. Locate the Wall Assembly Top Cover (SS-05) and secure to the Wall Assembly (SS-01) with provided screws (Fig.2) SS-01 SS-05 (Fig.2) SS-04 2. Floor Assembly Screw (SS-03) Front Back Floor Supports to (SS-04) Floor Joists using the provided screws.
Page 4
Sierra Pillar Shower – CTC105 Parts Identification & Assembly Instructions 4. Position (SS-01) Shower Wall Assembly centered and flush onto the back of the assembled base. Secure (H4) Angle Brackets to either sid eof the wall assembly with the provided lag screws.
Need help?
Do you have a question about the CTC105 and is the answer not in the manual?
Questions and answers