Page 3
CONTENTS Hazzard Conditions ........Note: This product is designed to be Important Note..........used with Boilers with inputs up What’s Included........... to 200,000 Btu/Hr. The design relies on the boiler’s integral Component Drawings........pump as the primary pump for the header system. Hanging the Boiler........
Page 4
Important Note: The contents of this manual are intended as guidelines for licensed professional installers. The manual is not a “do-it-yourself” guide for the non-professional. This manual is not intended to take the place of the boiler manufacturer’s installation manual which should be carefully followed.
Page 6
Installation Steps Mount Hydro Header wall bracket • If installing on a framed wall be sure to secure to a stud or use wall anchors to support 85lbs. Place Hydro Header on wall bracket. Slide the Hydro Header along the wall bracket to desired location.
Page 7
• Wire the boiler manufacturer’s supplied and recommended controls according to the installation manual supplied with the boiler and controls. • The Hydro Header 300 comes with pumps that are pre-wired to a zone relay. Provide 115V AC to the pump relay with a disconnect switch following local electrical codes.
Need help?
Do you have a question about the Hydro Header 300 and is the answer not in the manual?
Questions and answers