BLOTZ B20-ST-112 Quick Start Manual

20mm fountain

Advertisement

Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and
remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while
you allow glue to dry.
Fountain (B20-ST-112)
Remove the two base pieces from the sprue.
Next remove the large solid disks and the support
post from the sprue..
Remove the four rings from the sprue.
20mm Fountain
B20-ST-112
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Glue them together using the guidelines to align
then correctly.
Glue the support post to the base (you may find it
easier to glue a small piece of scrap to the
underide of the hole first.) and glue the discs to
the post as shown.
Glue these in a stack and attach them to the base.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the B20-ST-112 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for BLOTZ B20-ST-112

  • Page 1 During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while you allow glue to dry. Fountain (B20-ST-112) Glue them together using the guidelines to align Remove the two base pieces from the sprue.
  • Page 2 Take the two semi-cirles from the sprue. Glue them in place. Remove the two scalloped pieces from the sprue Carefully lining up the scalloped pieces, glue these along with the top nozzle sections. to the top of the column. Then glue the smaller discs into place.

Table of Contents