Download Print this page

Tarter LKSV12 Assembly And Installation Manual page 2

12' sentinel stall side vented lumber kit

Advertisement

K I T I N C L U D E S :
- (19) 46-3/4" X 6-3/4" TONGUE AND GROOVE
- (1) 46-3/4" X 6-3/4" GROOVE ONLY
- (1) 46-3/4" X 5-3/4" GROOVE ONLY
INSTALLATION NOTES:
– It is recommended to have the stall panel in its final location before installing the
lumber kit.
– All boards have a beveled edge. Please be aware for appearance consistency.
– A rubber mallet may be used to secure the boards tightly without damaging them.
GROOVE
TONGUE
INSTALLATION INSTRUCTIONS:
1.
Install 19 – 46-3/4" x 6-3/4" tongue and groove boards, with groove towards the frame.
The first few boards can be installed by leaning at an angle and sliding in the channel.
2.
Install 1 – 46-3/4" x 6-3/4" board, with groove only. Use notch to install final boards.
3.
Install 1 – 46-3/4" x 5-3/4" board, with groove only. Make sure the non-grooved side is
towards the frame. Last board may need to be cut to fit properly. Cut must be made to
the flat edge.
4.
Secure lumber with 4 - #10 x 1" Phillips screws, using the pre-drilled holes in the
channel It is important to screw the lumber in so the boards do not come out.
(Included in stall hardware)
1 0 T Y V 0 1 2
BEVELED EDGE
TA R T E R U S A . C O M
TO O L S N E E D E D :
- PHILLIPS SCREW DRIVER
- DRILL
- RUBBER MALLET
- TAPE MEASURE
- CIRCULAR SAW
( R E V 1) 0 4 0 5 2 2

Advertisement

loading