Do you have a question about the SB08 and is the answer not in the manual?
Questions and answers
Summary of Contents for Furnika SB08
Page 1
2 pcs SBDW08 Plug 2 pcs START SB08 MOUNTING DIMENSIONS for SB08 SCHEME OF GUIDE RAILS ADDITION assembly instruction NL – length of guide rails from the sidewall. Internal body dimension=LW Minimal internal size of body in depth (NL+3 mm)
Page 2
DRAWER ASSEMBLY AND MOUNTING FRONT WALL ADJUSTMENT FRONT WALL DISASSEMBLY Attach the left and right holder plates (of back wall and pot rack) Remove the plastic plugs to disassemble the front wall. Attach the sidewalls to the drawer bottom with the help Horizontal adjustment of the front wall from to the drawer back wall with the help of self-tapping screws.
Need help?
Do you have a question about the SB08 and is the answer not in the manual?
Questions and answers