Download Print this page

Advertisement

Quick Links

USER GUIDE
DRXmulti
DeckRail Xtra
@mrplanthireuk 
Head office: 120 Hertford Road, Enfield EN3 5AX | e: info@mrplanthire.co.uk
®
mr_plant_hire 
020 8351 3434
mrplanthire.co.uk
@mrplanthireuk 
@mrplanthireuk

Advertisement

loading
Need help?

Need help?

Do you have a question about the DRXmulti and is the answer not in the manual?

Questions and answers

Summary of Contents for MPH DRXmulti

  • Page 1 020 8351 3434 mrplanthire.co.uk USER GUIDE DRXmulti DeckRail Xtra ® @mrplanthireuk  mr_plant_hire  @mrplanthireuk  @mrplanthireuk Head office: 120 Hertford Road, Enfield EN3 5AX | e: info@mrplanthire.co.uk...
  • Page 2 020 8351 3434 User Guide mrplanthire.co.uk...
  • Page 3 020 8351 3434 mrplanthire.co.uk Important Read, understand and obey these safety rules and operating instructions and those of the host scissor lift before using the deckRailXtra® system. This user guide should be considered a permanent part of your machine and should remain with the machine at all times.
  • Page 4 User Guide Safety Rules Be aware Danger Failure to obey the instructions and safety rules in this manual and the appropriate Operator’s Manual on your scissor lift may result in death or serious injury. Do not use the deckRailXtra® system unless: You are trained and qualified to operate this machine You read, understand and obey: o MEWP Manufacturer’s instructions and safety rules...
  • Page 5 Personal safety and the continued safe operation of the machine should be your top priority. Safety Rules When Tandem mounting DRXmulti® transversely, ensure the separators are evenly spaced and DO NOT obstruct the MEWP exit. DO NOT EXCEED THE HOST MEWPS RATED CAPACITY.
  • Page 6 User Guide Read this User Guide thoroughly. This manual and the decals on the machine use signal words to identify the following: Safety alert symbol – used to alert Be aware personnel to potential personal injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death.
  • Page 7 User Guide Loading the deckRailXtra® system Ensure that the materials are loaded evenly onto the jaws of the deckRailXtra®. The centre of gravity of the load must be within the platform area of the scissor lift. Do not hang any weight over the edge of the scissor lift. Be aware of potential crushing hazards such as moving parts, free swinging or unsecured components when lifting or placing loads.
  • Page 8 User Guide Ensure that the load or materials do not obscure the controls or the operator’s visibility. Use the lashing straps to securely fasten the material to the jaws prior to operating the scissor lift Ensure the lashing strap is Securing the load using the lashing strap.
  • Page 9 User Guide Be aware Safe Working Load 80kg PER FRAME. The centre of gravity of the load must be within the platform area. The load should not hang outside the platform area or be unevenly distributed. The rated load of the deckRailXtra® system is also stated on the safety decals fitted to the equipment.
  • Page 10 User Guide Be aware When fitted with the deckRailXtra® system the scissor lift is for indoor use unless specified otherwise and ONLY after consultation with your supplier. The deckRailXtra® system is designed to assist the Operator or User to safely restrain materials in place during normal intended use as specified in the Operators Manual and this User guide.
  • Page 11 User Guide Be aware To ensure that the visibility of the operator is not compromised the load must be distributed so as to remain below the eyeline of the operator. All materials carried on the deckRailXtra® system must be securely lashed using the fastening device provided.
  • Page 12 User Guide The board carrier has been designed hold a sheet of maximum dimensions 2400 mm x 1200mm x 30mm Be aware Extreme care must be taken when manoeuvring the MEWP whilst the board carrier is used. The use of a Banksman is recommended and sight lines must be kept visible.
  • Page 13 User Guide...
  • Page 14 User Guide Maintenance Information  The deckRailXtra should be checked before use each day as part of the Operator’s daily pre-use inspection schedule.  It should be inspected to ensure that ALL fasteners are tight and in place.  Each jaw should be inspected for signs of wear/damage, paying particular attention to the restraining straps and anchor plates.
  • Page 15 User Guide Technical Specification Specification DRXmulti™ Weight 16kg Jaw width 200mm Jaw capacity 180kg Jaw Rubber Shore D90 + / - 5 Restraining straps Plain weave polyester, maximum breaking strain material 1000kg Finish: Yellow Zinc Be aware IF YOU HAVE ANY DOUBTS OR ARE UNSURE OF THE INTENDED USE OF THE...
  • Page 16 User Guide Unit 62, Mackley Industrial Estate, Henfield Road, Smalldole, West Sussex, BN5 9XR www.aerialandhandlingservices.com...
  • Page 17 020 8351 3434 mrplanthire.co.uk User Guide @mrplanthireuk  mr_plant_hire  @mrplanthireuk  @mrplanthireuk Head office: 120 Hertford Road, Enfield EN3 5AX | e: info@mrplanthire.co.uk...

This manual is also suitable for:

Deckrail xtra