Advertisement

Device for analysing
various ingredients
of beer
Article - No : 3572
FermentoFlash
User manual and reference guide
Date : August 2010
Initial Operation
1.
2
Initial Operation / Installation -----------------------------------------------------
3.
Initial Operation / Connect machine to the power ---------------------------
4.
Initial Operation / Connect mains cable ---------------------------------------
5.
Initial Operation / Connect hose -----------------------------------------------
6.
Initial Operation / Connect printer ----------------------------------------------
7.
Initial Operation / Switch on machine -----------------------------------------
8.
Initial Operation / Switch on printer, insert roll of paper ------------------
9.
Initial Operation / Machine operation-------------------------------------------
10.
Initial Operation / Turning the device on / off --------------------------------
11.
Initial Operation / Zero calibration ---------------------------------------------
Operation----------------------------------------------------------------------------------------
1.
Operation / Measuring-------------------------------------------------------------
2.
Operation / Rinsing ---------------------------------------------------------------
3.
4.
----------------------------------------------------------
5.
------------------------------------------------------------------
5.1. Return -------------------------------------------------------------------------
--------------------------------------------------------------
5.3. Intensive Cleaning ----------------------------------------------------------
5.4. Configure Parameters -------------------------------------------------------
5.5. Language Selection ---------------------------------------------------------
5.6. Adjust pump ------------------------------------------------------------------
5.7. Measurements per sample ------------------------------------------------
5.8. Date ----------------------------------------------------------------------------
5.9. Time ----------------------------------------------------------------------------
Maintenance
6.
Operation / Calibration -----------------------------------------------------------
6.1. Performing Calibration -----------------------------------------------------
6.2. Return -------------------------------------------------------------------------
6.3. Name -------------------------------------------------------------------------
6.4. Matrix --------------------------------------------------------------------------
6.5. Product Selection -----------------------------------------------------------
6.6. Fast / Precise -----------------------------------------------------------------
6.8. Entering the Reference Values ------------------------------------------
6.9. Starting B Calibration ------------------------------------------------------
How the FermentoFlash works ---------------------------------------------------------
1.
Structure of the Device ----------------------------------------------------------
2.
Description -l------------------------------------------------------------------------
3.
Sample suction tube --------------------------------------------------------------
4.
Pump ---------------------------------------------------------------------------------
5.
Replacement of the pump head -----------------------------------------------
-2-
Contents
-----------------------------------
3
3
3
3
4
4
4
4
4
5
5
6
6
7
7
7
8
8
8
8
8
9
9
9
8
8
9
9
9
11
11
12
12
12
12
12
12
12
13
13
14
14
14
14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FermentoFlash 3572 and is the answer not in the manual?

Questions and answers

Summary of Contents for Funke Gerber FermentoFlash 3572

  • Page 1: Table Of Contents

    Contents Device for analysing Initial Operation Initial Operation / Unpacking and checking package contents --------- Initial Operation / Installation ----------------------------------------------------- various ingredients Initial Operation / Connect machine to the power --------------------------- Initial Operation / Connect mains cable --------------------------------------- of beer Initial Operation / Connect hose ----------------------------------------------- Initial Operation / Connect printer ---------------------------------------------- Initial Operation / Switch on machine -----------------------------------------...
  • Page 2: Initial Operation / Unpacking And Checking Package Contents

    Requirements for the beer samples to be analysed -------------------- Initial Operation / Connect machine to the power. Entrainment ----------------------------------------------------------------------------------- Error message / Trouble shooting ---------------------------------------------------- Power connection: 230 V / 180 VA or 115 V / 180 VA Technical data ------------------------------------------------------------------------------- The power connection is located on the back side of the device together with Ordering data----------------------------------------------------------------------------------- the on/off switch, voltage selector switch and mains fuse.
  • Page 3: Initial Operation / Zero Calibration

    Initial Operation / Turning the Printer on Zero calibration is used to calibrate the hardware. It is not calibration of the substances in the beer. This is performed with the B calibration. If you would Switch on the printer using the sliding switch on the left side of the printer. like to check the zero calibration process, please carry out a control (See also the operating instructions for the printer).
  • Page 4: Operation / Rinsing

    Operation / Rinsing Approx. 5 seconds Return: After the Enter button has been pressed the display returns to the main menu. Place a suitable canister with approx. 100 ml of distilled water in front of System Status: After the Enter the machine and put the suction tube into this canister.
  • Page 5: Adjust Pump

    The calibration consists of two calibrations (two point calibration) while only one Adjust Pump: You can adjust the sample pump in such a way that the calibration is necessary for most types of beer. A two point calibration is only sample quantity displayed is the same as the actual sample volume.
  • Page 6: Operation / Calibration

    Step Name: Profile name. Any name can be entered. With the help of the B calibration with the undiluted reference beer. Please activate all parameters arrow buttons it is possible to select and enter the respective letters. with the exception of alcohol, and put in the reference values (extract, original worth, app.
  • Page 7: Starting B Calibration

    How the FermentoFlash works Starting B Calibration 1. Structure of the device Place the sample suction hose in a sample vessel filled with reference As can be seen from the picture and the operating principle diagram, the device is beer. There must be at least 80 ml of reference beer available. equipped with 2 measurement cells.
  • Page 8 The suction tube can be removed from the beer sample after the suction Requirements for the beer samples to be analysed process unless several analyses have been configured. 1. Free of interfering gas bubbles Remove the CO content using appropriate measures. 4.
  • Page 9 Error messages / troubleshooting Sample flow rate: up to 100/h (typical 60/h) The following error messages are displayed and/or printed. Sample volumes: 10 ml Interfaces: 1 x parallel, 1 x serial (RS 232/ 9600 Baud) 6 Volt power supply for thermal printer (Item No.
  • Page 10 FUNKE FUNKE FUNKE FUNKE GERBER GERBER GERBER GERBER Funke-Dr.N.Gerber Labortechnik GmbH Ringstraße 42 12105 Berlin EC declaration of conformity according to EU-Directive Machines 06/42/EC We hereby declare that the machine specified below complies with the basic health and safety requirements of the EC Machines Directive in its design and construction and in the configuration put on the market by us.

Table of Contents