Contact Talent-MG2 Monitoring System Packing List Product Appearance Technical Data Installation Wi-Fi Configuration (Only Talent-MG2-WU) LED Description Website Configuration Step 1: Install the microinverter and the monitoring device Step 2: Establish an account Step 3: Networking for the monitoring system...
All repairs should be carried out using only qualified spare parts, which must be installed in accordance with their intended use and by a licensed contractor or authorized TSUNESS service representative. Contact If you have technical problems about our products, contact the TSUN Service line.
2.4G RF wireless to collect the data and status of the microinverters in the system. At the same time, Monitor Device connects to the Internet through WIFI (Talent-MG2-WU) or GPRS (Talent-MG2-GU), which realizes the information exchange with the monitoring service and sends all the running data of microinverters and status of the system to the monitoring server.
Talent-MG2-WU/GU Technical Data Model Talent-MG2-WU Talent-MG2-GU Communication to Microinverter Signal 2.4G RF 100m Maximum Distance(Open Space) 99 panels Monitoring Data Limit Communication to Server Sample Rate Per 15 minutes WIFI(2.4GHz) Signal Power Supply (Adapter) Type Adapter with USB port Input Voltage/Frequency...
Talent-MG2-WU/GU Installation 1. Plug the USB connector into the adapter. 2. Plug the adapter into a wall socket or a socket on the table. *The wall socket or the table should be more than 1 meter above the ground. *The table should not be metal or concrete structure (to prevent the effects on 2.4G RF signal).
Talent-MG2-WU/GU Wi-Fi Configuration (Only Talent-MG2-WU) 1. Connect the wireless name of MG2-WU via computer or mobile phone. 2. Open the browser and enter 10.10.100.254 to open the Wi-Fi configuration page. The username and password are ‘admin’ by default. 3. Click the Wi-Fi parameter menu on the left menu bar to enter the Wi-Fi parameter configuration.
Talent-MG2-WU/GU 5. Enter the password and click Save. 6. Click Restart. LED Description LED Light Blue Green Red+Blue+Green Power-on Alternate Bright (1s) Upgrade procedure Alternate Shining (1/3s) normal operation Bright ID search is not complete Shining Not ID Bright Not connected to WIFI...
3. Make sure the microinverter system and the monitoring device are working well. Step 2: Establish an account 1. Visit the monitor website pro.solarmanpv.com directly. Or enter this monitor website by the official website of TSUNESS www.tsun-ess.com . 2. Click the “Register” button and register a new account. www.tsun-ess.com...
Talent-MG2-WU/GU Step 3: Networking for the monitoring system 1. Login to the platform and find the “Network” page by Applications → Network. (Please make sure that the monitoring device has already connected to the server.) 2. Click “+Select” to input the SN of monitoring device.
Talent-MG2-WU/GU Step 4: Create a Plant 1. Find the “Plants” page by Monitor → Plants. Click ‘Create a Plant’ to create a new plant. 2. Input basic information, system information, yield information and owner information in this page. www.tsun-ess.com...
Page 12
Talent-MG2-WU/GU Click “Save” and add a monitoring device in this plant. Click “add a New Gateway/Logger” and input the SN of the monitoring device. 4. All the plants can be viewed and managed in “Plants” page. www.tsun-ess.com...
Talent-MG2-WU/GU Step 5: Edit the system layout 1. Find the “Plants” page by Monitor → Plants → “plant name” . Then enter the "Layout" page and click “Click here to edit system layout”. 2. Drag the components to the right side to finish the physical layout.
Need help?
Do you have a question about the Talent-MG2-WU and is the answer not in the manual?
Questions and answers