!
CAUTION! Wear appropriate PPE when working with chemicals. Backflow prevention required.
1
Install &
Connect
A. Mount SLX
enclosure to wall
B. Flush supply lines
C. Install backflow
prevention per
local guidelines
D. Connect supply
lines:
• Compressed air
(1/4" NPT)
• Water (3/4"
NPT)
E. Connect discharge
hoses
F. Place chemical
containers below
unit
2
Dilution
A. Select a metering tip for desired dilution ratio
B. Install the metering tips by screwing it onto the hose
barbs for each chemical inlet
C. Install chemical suction lines to hose barbs
D. Connect suction lines to chemical solution
Metering Tip Calculator
Mobile App:
Last Updated: 04/12/2022
SANITIZER SUPPLY BALL VALVE
SANITIZER WATER PRESSURE GAUGE
SANITIZER
SANITIZER CHEMICAL INLET
DOOR LOCK
SANITIZER SOLUTION LINE WITH
STRAINER & CERAMIC WEIGHT
SANITIZER DISCHARGE HOSE (RED)
SANITIZER
DISCHARGE
BALL VALVE
Venturi Sanitize Rinse Foam
RINSE SUPPLY
BALL VALVE
RINSE
STATION
RINSE
DISCHARGE
HOSE
RINSE DISCHARGE
BALL VALVE
3
Operation
A. Take hold of spray wand for the system
B. Open discharge ball valve
C. Open water supply valve - unit will spray
D. Verify water pressure is at least 35 PSI
E. [Foamers] Open air supply valve - unit will foam
F. [Foamers] Adjust air pressure to alter foam quality
G. Foam equipment, from bottom to top, and rinse
before it dries
H. Rinse from top to bottom
I.
When complete, turn off supply valves
J.
Store rinsed hose depressurized, with discharge
valve open, and coiled properly to prevent kinks
Quick Start Guide
Example Installation
WATER SUPPLY (35 - 125psi)
3/4" NPT CONNECTION
FOAMER SUPPLY
BALL VALVE
FOAMER
CHEMICAL
INLET
FOAMER
DISCHARGE
BALL VALVE
M2448 - SLX-MS3-VS-RN-VF Quick Start Guide
FOAMER WATER
PRESSURE GAUGE
AIR SUPPLY (1/4" NPT)
AIR
REGULATOR
AIR PRESSURE
GAUGE
AIR SUPPLY
BALL VALVE
FOAMER
FOAMER SOLUTION LINE
WITH STRAINER &
CERAMIC WEIGHT
FOAMER DISCHARGE HOSE
Need help?
Do you have a question about the SLX-MS3-VS54-RN-VF06 and is the answer not in the manual?
Questions and answers