CE -225 Mesh Conveyor Heat Tunnel Packaging Machine Contents I. Foreword ............1 II. Function ............1 III. Technical Parameters ........2 IV. Panel .............. 3 V. Instructions for Operation ......4 VI. Electrical Diagram .......... 7 VII. Component Diagram ........9 VIII.
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine I.Foreword The CE-225 Mesh Conveyor Heat Tunnel Machine has the advantage of high heating efficiency, accurate temperature control and stable performances. II.Function The thermal shrink packing method is a popular and economical packaging method in the packing industry.
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine III. Technical Parameters Voltage 220V, 50~60Hz Power 7.65 Kw Speed 0-10 m/min Tunnel Size 800x400x200 mm 31.5 x 15.75 x 7.9 in. Load 5Kg (11 lbs) Machine size (Low) 1060x620x815 mm 41.75 x 24.5 x 32 in. Machine size (High) 1060x620x1240 mm 41.75 x 24.5 x 48.9 in.
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine IV. Panel 1 Temperature Control Display/Adjust temperature inside Shrinkage Furnace 2 Heating Adjustment Adjust Power of Heating Pipe 3 Conveying Adjustment Adjust speed of conveying motor 4 Conveying Switch Controlling switch of conveying belt motor 5 Heating Switch Switch for controlling heating tube in shrinkage furnace...
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine V. Instructions for Operation Place the machine on a level surface and remove the outer package. For the operator’s personal safety, the machine must be grounded according to the regulations before use and ensure that the contact is good (good grounding can reduce the electric shock damage to the human body when a single-phase ground fault occurs in the electrical appliance.) Connect to the power supply according to the power supply voltage...
Page 7
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine Adjust the heating adjustment know to the appropriate position according to the shrinkage rate of the film. Page 5...
Page 8
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine Turn on the conveyor switch and adjust the conveyor know to adjust the conveyor speed to the appropriate gear position. After the above operation is completed, let the machine run (preheat) for 5-10 minutes, then open the fan switch on the panel.
Page 9
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine During the shrinking process, the speed and temperature can be adjusted according to the actual situation. Since the temperature and speed are mutually restrained, it may be necessary to repeat the adjustment several times to meet the requirements.
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine VII. Component Diagram Page 9...
Page 12
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine Number Item Material Electrical Box Cover 1.0/Q235 Electrical Box Group Weldment Tunnel Group Weldment Medium Grid Combination Group Weldment Heat Pipe assembly Curtain vertical bead 1.5/Q235 Curtain horizontal strip 1.5/Q235 Thermal insulation board Group Weldment Upper Liner 1.0 / Galvanized Sheet...
Page 13
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine Number Item Material Explosion-Proof Bulb Curtain High Temperature Cloth Electrical Floor 1.0/Galvanized Sheet Electrical Control Assembly Cover Group Weldment Observation Window Partition Group Weldment Observation Window Platform Group Weldment Observation Window Partition Group Weldment Guide Assembly Furnace Shield...
CE -225 Mesh Conveyor Heat Tunnel Packaging Machine VIII. Troubleshooting Case Cause Solution No Heat in the Tunnel No Power Turn On Power Heating Switch Broken Replace AC Contactor, Solid- Replace or Repair booster temperature meter is broken Heat adjustment is in Adjust the lowest position Temperature of Tunnel...