Download Print this page

Advertisement

Quick Links

<
Manual includeds UP-I and UP-IS models.
Please make sure that you should identify your correct model and follow its instruction.
● It is an environment-friendly product developed in accordance with the [Water Saving Regulations]
according to the [Water Saving Law] of the Environmental Ministry in Korea.
● The installation drawings may be partially different from the actual appearance. This is only for
helping to understand for installation process.
● In order to improve the quality of products, interior and exterior parts are subject to change without
notice.
/
>

Advertisement

loading

Summary of Contents for CEBIEN UP-I

  • Page 1 < > Manual includeds UP-I and UP-IS models. Please make sure that you should identify your correct model and follow its instruction. ● It is an environment-friendly product developed in accordance with the [Water Saving Regulations] according to the [Water Saving Law] of the Environmental Ministry in Korea.
  • Page 2 UP-I / UP-IS Quick installation drawing Carefully read the installation drawings & procedures and do installation. Manufacturer or distributors will not be responsible for malfunction if you install products at your disposal without following installation instruction. Stop valves direction to 7 o’clock...
  • Page 3 Refer to drawing and reel in sealing (teflon) tape on thethreading part of provided two stop walves (taping it 8~12 times) Secure upper & lower holes for screw bolt and make hole on 6 points of ‘A’ (use spirit level) ( 6.5mm drill bit, depth: 50mm) make hole on 6 points of ‘A’...
  • Page 4 Connect hose Cold Connect each flexible pressure hose (from the product body) to stop valves with hand first With using spanner, fasten them tightly (Careful for flexible hoses not to be folded) ● Blue marked water pressure hose: connect to stop valve for cold water ●...
  • Page 5 1) Connect pipe ‘c’ to ‘b’ 2) Adjust the height of upper pipe ‘c’ for user 3) Connect the assembled pipe with product body Fasten pipe adapter not to leak out water...
  • Page 6 1) Check leverl and mark the hole with pencil 2) Make holes and insert nylon anchor 1) Fix screw bolt with insert cap on the wall with using plus head screw driver 2) Put on side covers Connect shower head with upper pipe 1) Assemble shower hose ‘h’...
  • Page 7 Mark drilling points where the slide bar is located. Drilling and insert nylon anchor. Fix slide bar on the wall with screw bolt. 1) Assemble shower hose ‘h’ with product body * Insert rubber o-ring in the shower hose 2) Assemble hand shower to shower hose on the other side. Check all the functions after completing installation and keep turning on until clear water ome out and use it.
  • Page 8: Safety Regulations

    Before requesting (after sales) service -Is the house water supply cut off? -Isn’t the water supply valve locked? Water does not come out. -Have you pulled the hot / cold water handle firmly forward? (Turn the handle clockwise to warm water, counterclockwise to cold water) -Is the water pressure originally weak or the pipeis too narrow? Low water pressure -Is the water main valve open toolittle?
  • Page 9: Product Warranty

    In case of a malfunctionoccurs due to the repairing of unqualified technician In case of failure due to the use of non-genuine parts specified by CEBIEN Check if there is any installation problem (leakage, water pressure, shaking) before using the product.

This manual is also suitable for:

Up-is