PATIO M Marking Note lenght SAUNA BENCH 600x1787 SAUNA BENCH 600x1787 SAUNA BENCH 500x1485 SAUNA BENCH 500x1080 SAUNA BENCH 200x1075 BENCH SUPPORT AND POSTS 45x45 SET BENCH SUPPORT FRAME AND SIDE PANEL SET DOOR 88x690x1860 BRONZE PREMIUM WITHOUT FRAME HANDLE...
Page 8
*OPTIONAL ROOF COVER SCREW FOR METAL FOOFING SHEETS EPDM ROOF COVER LAYER 3.4x3.05 EPDM ROOF COVER GLUE 2.5l PAINT ROLLER METAL ROOFING SHEET 1604mm LENGHT METAL ROOFING SHEETS 63mm WIDTH 2500 1900...
Page 10
Floor Frame PATIO M *Install water drainage detail before first log wall row Screws 90mm Water drainage detail Take care! Sharp edges! *Use 90mm screws and battery drill GSPublisherVersion 0.16.100.100...
Page 11
First log row PATIO M Fix first log wall row to the floor frame with 180mm screws (Suggestion: drill hole before inserting the screws) Screws 180mm Leave 5mm gap outside with floor frame and 1st wall row GSPublisherVersion 0.16.100.100...
Page 12
Posts PATIO M *Install 70mm screws as shown in scheme: 18x145 Outside moulding 18x95 Outside moulding 15x46 Inside moulding 15x55 Inside moulding * Use level tool and battery drill to fix walls to posts Screws 70mm *2 screws per wall log connection...
Page 13
Wall layouts PATIO M Wall A (view from outside): Wall B: Wall C (view from outside): Door 590x1860 2,400 2,400 1,920 Wall 2 (view from outside): Wall 1 (view from outside): Top view: 3,290 1,700 2,085 1,085 Window Window 845x1860...
Page 14
Last row PATIO M * To install wall logs use rubber hammer and hammer block Install last wall detail to the second to last wall detail with 180mm/ 90mm screws (Suggestion: drill hole before inserting the screws) Screws 180mm Screws 90mm (only wall 2) GSPublisherVersion 0.16.100.100...
Page 15
Top view Ceiling beams and joist hanger PATIO M Temporarily attach roof board on top of the walls. Measure out 95mm from roof board CELING BEAMS (downward) and 547mm from the walls for the joist hanger 1,830 1,830 Temporarily attach roof board on top of the walls. Measure out 95mm from roof board (downward).
Page 16
2.09 Roof boards PATIO M 1,98 Cut the last roof board to lenght T-1 =2215mm 3,210 SUGGESTION: Start with half roof board, otherwise the final board will be too small Cut the last roof board to lenght T-1 =2215mm 2,220 Use 8 nails (75mm) per roof board GSPublisherVersion 0.4.100.100...
Page 17
Ceiling PATIO M Outside lining boards STP-2 Ceiling lining boards STP-1 Insulation Kingspan 30mm Distance board 15mm Ceiling board 15x55mm Install the SPU insulation to the beams/ rafters with the distance board and 70mm screws Screw 70mm Insulation Kinspan 30mm...
Page 18
1 900 Floor Boards AR-1 PATIO M AR-1 Cutout AR-3 AR-1 *Apply plywood (3/6mm) on floor frame before floor boards AR-1 Floor board cutoff (cut in site) AR-1 Floor boards 45x45mm in corners Section AR-1 AR-1 Cutout AR-3 +6mm *Apply plywood (3/6mm) on floor frame before floor boards...
Door and window PATIO M Door and window Fix the door frame to the door leaf. Use 70mm screws. Lift the door in place sideways as shown, then fix the door leaf to the log wall from outside Fix the door frame to the door leaf. Fix with 70mm screws.
Page 20
Outer lining boards PATIO M Roof lining boards Outer lining boards Nails 40mm Base board 15mm Nails 40mm STP-2 WALL LINING BOARDS 14mm Distance board 15mm Wall lining boards Nails 40mm Distance board 15mm STP-2 WALL LINING BOARDS 14mm Outer lining boards GSPublisherVersion 0.12.100.100...
Page 21
Mouldings PATIO M *Corner moulding cutoff GSPublisherVersion 0.16.100.100...
Page 22
Sauna Benches PATIO M Sauna Benches +850 Upper bench +400 570mm Check that heater safety distance is acquired. Lower bench If neccesary move lower bench back 1. First fix the bench supports to the wall 2. Then lift the benches on top of them 3.
Page 23
Sauna Benches PATIO M Upper Bench Upper Bench Post cutoff 45x45 Post cutoff 45x45 Post cutoff 45x45 1,485 1,080 Bench support frame 45x45 1,008 Adjustable feet 20mm (3pcs) Post cutoff 45x45 Side view Lower Bench 1,076 1,036 GSPublisherVersion 0.16.100.100...
Page 24
Ventilation louvre and grids PATIO M Vent louvre and grids Vent louvre and grids Install ventilation louvre (1pcs) and ventilation grids (3pcs) Install ventilation louvre (1pcs) and ventilation grids (3pcs) =15cm =15cm Use saw or diamond drill bit Use saw or diamond drill bit...
Page 25
Roof cover PATIO M *Optional roof cover Back profile Metal profile *Attach back profile plate before roof cover Side profile Metal profile Roof moulding Roof cover Front profile Metal profile Roof cover Wood block 40x30mm (01E) Moulding GSPublisherVersion 0.11.100.100 GSPublisherVersion 0.16.100.100...
Page 26
EPDM roof cover Tools: 1. Clean the roof surface from dirt, dust, ice, snow etc. 2. Check for defects before installing the roof cover. 3. Get the rubber in position and check for correct overhang. 4. Fold or roll the rubber roof cover and start applying the glue on the roof and rubber surface. 5.