Download Print this page

Advertisement

Quick Links

Advertisement

loading

Summary of Contents for PDE AXC

  • Page 2 Page 14–15 ........................Front S-Clamp Assembly Installation Page 16–17 ......................Final Assembly-Connecting Bar Assembly Page 17 ....................................Notes PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 3 6.1—5/16” Hex Head Bolt Caps ......(Qty 7) 6.2—5/16” Hex Head Nut Caps ......(Qty 7) PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 4 HKT-201 Cont. (Qty 1) 6.3—Anti-Seize Compound ........(Qty 1) Packed By: Date: Inspected By: Date: PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 5 ASSEMBLY INSTRUCTIONS RIGHT HAND S-CLAMP OVERVIEW PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 6 APPLYING ANTI-SEIZE COMPOUND TO PREASSEMBLED REAR CLAMP ASSEMBLY STEPS 1 2: ANTI-SEIZE COMPOUND APPLICATION RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 7 STEPS 3 4: BUSHING INSERTION RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 8 Gas Spring Assy Clamp. STEPS 5 6: REAR S-CLAMP ASSEMBLY ATTACHMENT RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 9 Step 8: Finger-tighten Rear Clamp. STEPS 7 8: REAR CLAMP ASSEMBLY RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 10 STEP 9: S-CLAMP HANDLE RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 11 Verify the S-Clamp dimensions are set approximately as STEP 10: FINAL REAR S-CLAMP ASSEMBLY RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 12 S-Clamp Assembly. STEPS 11 13: LOCK CLAMP STRIP NUT RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 13 Step 16: Torque to 10 N-m STEPS 14 16: S-CLAMP HANDLE LOCK CLAMP RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 14 Step 17: Loosen the Crossbar Clamp Bolts as shown. STEP 17: FRONT CLAMP ASSEMBLY RESULTS PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 15 Step 20: Align center of Front Hook Assembly to Rear Hook. Torque Front Hook Assembly Crossbar Clamps to 13 N-m. PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 16 Rung until snug as shown. Step 23: Torque Front Ladder Hook to 13 N-m. PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...
  • Page 17 S-Clamp Handle Lock Clamp is properly set according to Steps 14-16 of this Assembly Manual. PRIME DESIGN EUROPE ▪ Bietenweg 22 ▪ 3300 TIENEN (Belgium) ▪ Tel: + 32 16 22 60 99 ▪ Fax: + 32 16 22 60 99 ▪ www.pde-group.com...