Page 1
User Manual Automatic Hand Dryer Installation Instructions Model: AHD-3 & Model: AHD-5 Specifications Stainless Steel Front Cover 110 - 120V 11.7 Amps 550 - 1200W Hardwire Connection HEPA Filter All hardware necessary for satisfactory installation AHD-3 AHD-5 Tools Needed 11-7/8”...
Page 2
Mounting instructions Connect the hand Dryer All wire connections MUST BE conducted by an experienced electrical contractor. Connect to an independent 20 Amp circuit braker. Electrical Box Install Electrical Box inside Grounding device the wall. Location is shown in 02 page 1, point 2 Electrical Box must be Hand dryers MUST BE flush with the wall surface.