1. Introduction ........................4 Descriptions on Instrument Parts ..................... 4 1.1.1 Main Unit of SPT-20 ........................... 4 1.1.2 View from Back of SPT-20 ........................5 Cautions before Use ........................6 1.2.1 Precautions on Handling ......................... 6 1.2.2 Permission by Operation .......................... 7 1.2.3...
Page 3
Ion Coater SPT-20 Operating Manual Before using the instrument, please read this manual carefully and understand the ⚫ directions. Keep the manual in a conspicuous place. Some devices or functions in the manual may not be provided and can be different ⚫...
Ion Coater SPT-20 Operating Manual Introduction Descriptions on Instrument Parts Names and functions of the parts of SPT-20 are described as follows. 1.1.1 Main Unit of SPT-20 ① ② ③ ④ ⑥ ⑤ Items Descriptions Target inside ① Vacuum Chamber...
Ion Coater SPT-20 Operating Manual 1.1.2 View from Back of SPT-20 ④ ① ⑤ ③ ② Items Descriptions ① Main Power Main system and rotary pump turning ON/OFF ② System Power cable plug Connection for system power cable ③ Fuse Holder Fuse(1.5A) inside...
Ion Coater SPT-20 Operating Manual Cautions before Use 1.2.1 Precautions on Handling If fine dust or debris gets inside the microscope, the instrument may not function properly. Wear gloves and do not touch the parts inside the vacuum area with hands directly.
Ion Coater SPT-20 Operating Manual 1.2.2 Permission by Operation Following operations should be entrusted to specific personnel as described below. Division of operations Detailed performances General operation System operator Calibration Certified engineer from maker Hardware replacement Certified engineer. From maker...
Ion Coater SPT-20 Operating Manual 1.2.3 Safety Guidelines Before using SPT-20, review the following instructions carefully Items Descriptions WARNING Instructions which, if not followed, can cause severe injuries to user Instructions which, if not followed, can cause moderate injuries or CAUTIONS damage to the instrument.
Ion Coater SPT-20 Operating Manual 2. Specification Rotary vacuum pump Descriptions AC 110V or 220V, 50/60 Hz, 0.12 kW Electronic 120(W) X 373.5(D) X 200(H) mm Dimension 1,700 rpm Motor Speed Ultimate Pressure ≤3 X 10 Torr (4.0 X 10 Oil Capacity 0.2L...
Ion Coater SPT-20 Operating Manual Composition Item Number(ea) Main unit Rotary Pump Au Target Power Cable Vacuum Hose Operation Manual Installation Requirement Clean, Dry, Dust Free surface, Factor Requirement Temperature 15 ~ 30℃ (59 ~ 86℉) Humidity Less than 60% Voltage Single Phase, 220V ±...
Power On Main Power (SPT-20 w/ Rotary vacuum pump) ① Switch on back side from SPT-20. At this time, Rotary vacuum pump’s power must be plugged in SPT-20 ② After press a power in up-side, Vacuum Begins immediately that reaches to 0.1 torr within 3min ③...
Ion Coater SPT-20 Operating Manual 5. Maintenance Error List ① “V-sensor error”: Normally occur by vacuum → Request SVC ② “Touch SW error”: Normally occur by touch program → Request SVC Replacing Target ① First, Wearing poly gloves then remove insulation support of the electrode ②...
Ion Coater SPT-20 Operating Manual Cleaning of chamber - Required item: wipes for laboratory, methyl-alcohols, blowing air ① Wet wipes by methyl-alcohols ② Cleaning inside of chamber, rubber pad that wrapped around chamber and flange surface inside chamber Request SVC: Migun Techno World #201, Migun Technoworld, 199 Techno2-ro, Yuseong-gu, Daejeon, Korea Tel.
Need help?
Do you have a question about the SPT-20 and is the answer not in the manual?
Questions and answers