Page 2
Quick Installation Guide Proper installation and termination ensure the correct operation of the patch panel. Tools Required (not included) • RJ45 cable stripping tool • 110 or Krone type Tool NOTE: It is recommended the Patch Panel be installed on the front or rear rails of a 19” rack during the wiring process.
Page 3
2. Arrange the wires into the patch panel according to the wire scheme pinout you want to use (T568B or T568A). 3. Use a 110 or Krone type punch tool to secure each wire into the patch panel and terminate each wire carefully.
Page 4
Accessories/Accesorios/Accessoires/Zubehör/Accessori/Accessoires/Accessórios English: Five Year Limited Warranty V7 Limited Manufacturer’s Warranty covers this Product against defects in materials or workmanship from the date of purchase for a period of sixty (60) months for parts and labor. Liability under this limited warranty shall in no event exceed the cost of replacement or the original cost of the product at the time of purchase. In the event of product discontinuance or unavailability wherein failure has occurred the product shall, at the sole discretion of Manufacturer, be replaced to the first purchaser with a substantially similar product of equal or lesser value or the first purchaser shall be provided with a refund equal to the original i.e.
Need help?
Do you have a question about the NPP1U24 and is the answer not in the manual?
Questions and answers