Page 1
Smart One Installation Guide Step by step Instructions for Plug and Play Capacitor Banks 1) Remove Fixing Screws for the front Panel 2) Remove or Adjust Cable Entry if Included ( IP52 Models) 3) Connect 3 Phase Input Wiring, as per Diagram in Appendix 1 -Connect L1,L2,L3 in sequence as shown on the next page.
Page 2
Smart One Installation Guide 4) Connect Neutral to the Neutral Terminal or if no neutral terminal to the left side of the 2 Pole MCB 5) Connect Incoming Earth to Earth Terminal (Mandatory for Australian Installtions) D Rehe 6/10/2021...
Page 3
Smart One Installation Guide 6) Connect CT to S1 and S2 Terminals -Note the CT Must be connected close to the switchboard in order to measure the full load current on the switchboard. -5 Amp Secondary CT’s Must be used...
Smart One Installation Guide In order to make adjustments to the PFC Controller Operation Front Panel KEYBOARD Note: Test Mode checks all relays Press 5s to enter the configuration Note: programming should be done by professional after Press to increase reading this manual.
Smart One Installation Guide Press for 5 seconds to enter configuration mode CONFIGURABLE SCREENS Configuration PROG. Basic parameters *To move from one screen to another press SETTING TABLES Paramater Range Default Value Cos FI 0.800 (ind) 0.95 a 0.800 (cap)
Page 6
Smart One Installation Guide SPECIFICATION (PFC Cap Bank) SPECIFICATION (PFC Controller) D Rehe 6/10/2021...