CONTENTS Chapter 1 Machine Description Uncrating Instructions Installation Electrical and Pneumatic connections Chapter 2 Technical Parameters and Description Chapter 3 Operation Instruction Machine general assembly drawing Oil tank subassembly drawing Oil spraying machine subassembly drawing Chapter 4 Equipment main material list Table of material list Chapter 5 Transportation of the equipment and adjustment of instalation 5.1...
Chapter 1 Machine Description The machine contain the oil tank components (with the pump), oil conveying pipe, spraying oil pipe, oil collecting pan, reflow pipe and liquid level control. With compact and briefness structure, easy dismounting and replace the parts. Easy control, easy operate, low power consumption, good effect etc.
Electrical and Pneumatic connections This machine requires only a single phase connection and earth wire DISCLAIMER IMC will not be held responsible fir incorrect installation and subsequent failure of the machine due to any installation procedure not being followed.
Chapter 2 2.1 Technical Parameters and Description Oil consumption Be determined by the can number Topping up of oil way Manual ɸ25.4 Oil supply pipeline ɸ38.1 Reflow pipeline Total power 0.37Kw 400x400x400mm (L*W*H) ≤64L Oil tank parameter ɸ73H113mm, ɸ65H103mm Suitable can size Production Be determined by the production line Oil spray machine dimension...
Chapter 5 Transportation of equipment and adjustment of installation Packaging: The machine uses wooden cases or briefness packaging. And the machine has some place connecting with the packing for fastening, and all the pieces are tied up with transparent plastic film. Transportation: ...
Chapter 6 6.1 Attentions and safety Attentions: When the machine break down, should immediately notify the special maintenance personnel When the equipment is running, you must ensure that no personnel in the danger area Checks before running: Every time before start the equipment, should check the fastener screw down or not, at the same time, to be insure if the tank and the multi-grade pump damage, specific needs according to the production requirement.
operate, can cut off the general power. Before the equipment maintenance, all the field force need to pay attention: Before the maintenance and repair because of the leak, please to clean the equipment. Before maintenance and repairing must emptying the equipment residue liquid. Safety instruction: To be ensure the operator’s own life safety, when operating and adjusting the equipment, please reading carefully the safety instruction section and safety rule, and the usage...
Need help?
Do you have a question about the IMCNL-HD-PY02 Series and is the answer not in the manual?
Questions and answers