OGS Merlin 1000V+ Installation Operation & Maintenance

Gas & electric isolation controller with ventilation interlocking

Advertisement

Quick Links

Installation & Operation Manual
Merlin 1000V+
Merlin 1000V+
Gas & Electric Isolation Controller with Ventilation Interlocking
Installation, Operation & Maintenance
Please read this manual carefully and retain for future use.
For specific requirements that may deviate from the information in this guide – contact your supplier.
Oceania Gas Safety
www.oceaniagassafety.com
1
Rev: 04
08-22

Advertisement

Table of Contents
loading

Summary of Contents for OGS Merlin 1000V+

  • Page 1 Installation & Operation Manual Merlin 1000V+ Merlin 1000V+ Gas & Electric Isolation Controller with Ventilation Interlocking  Installation, Operation & Maintenance Please read this manual carefully and retain for future use. For specific requirements that may deviate from the information in this guide – contact your supplier. Oceania Gas Safety www.oceaniagassafety.com Rev: 04...
  • Page 2: Table Of Contents

    Installation & Operation Manual Merlin 1000V+ Contents Important Warning Statements ..............3 Installation ....................4 Typical Application & Location ..................4 Mounting & Cabling ......................4 Circuit Board Connections Overview ................5 Switch Settings – Auto RST (Panel Auto Reset) ............9 Switch Settings –...
  • Page 3: Important Warning Statements

    At the end of their working life, electrochemical sensors should be disposed of in an environmentally safe manner. Alternatively, they can be securely packaged and returned to OGS clearly marked for disposal. Electrochemical sensors should not be incinerated as this may cause the cell to emit toxic fumes.
  • Page 4: Installation

    Installation & Operation Manual Merlin 1000V+ Installation Typical Application & Location Installation must be carried out by a licenced, insured contractor! Ensure that detectors are not exposed to liquid or dust contamination! Cables must be protected against mechanical damage! Please refer to your detector manual for important information regarding coverage, location and positioning including areas and conditions to avoid.
  • Page 5: Circuit Board Connections Overview

    100-240V~ Mains Power should be supplied to the [POWER / LINE IN] terminal and fused at 3A. On connecting the mains supply to the panel, the red power LED indicator will light up – this is located on the front cover (OGS Logo). GAS VALVE OUTPUT 100-240VAC electrical power supplied from the [VALVE OUT] connector using a 3-core cable can be connected to a gas solenoid valve which can shut the gas supply on alarm status.
  • Page 6 Installation & Operation Manual Merlin 1000V+ PRESSURE SENSOR Pressure sensors should be screwed to the downstream port of the valve. Pressure Sensors are tested and certified to AS 4628/2005. The pressure sensor is wired to the [PRESSURE SENSOR] connector and screwed into the downstream port of the gas solenoid valve.
  • Page 7 Installation & Operation Manual Merlin 1000V+ Connecting a Merlin Gas Detector X Connecting a Merlin CO2X FAN SWITCHES This terminal, switches when the key is turned on and off. This can be connected to a fan switch (supplied separately) which can provide power to fans when the control panel is switched on.
  • Page 8 Wiring to external air pressure switches or current monitors should made using a two-core cable. This is a volt free connection. The example is monitoring two fans using an OGS PM2+. 12V DC This is a power output for external auxiliary devices when there is power at the panel and can be used to create a relay switch with the BMS relay output.
  • Page 9: Switch Settings - Auto Rst (Panel Auto Reset)

    Installation & Operation Manual Merlin 1000V+ Switch Settings – Auto RST (Panel Auto Reset) There are various dipswitches on the front circuit board that can be adjusted to configure your system as per the following. There is a switch located on the circuit board labelled [AUTO RST]. When power is restored after the power cut/ loss, the panel must be restarted manually.
  • Page 10: Switch Settings - Time 1 & 2 (Automatic System Timeout Period)

    Installation & Operation Manual Merlin 1000V+ Switch Settings – Time 1 & 2 (Automatic System Timeout Period) Upon timeout the gas supply will be turned off. There are two dipswitches [Time 1 & Time 2]. The system has an auto-shut down feature after a selected time. These can be configured to select the required timeout/ shut-down period.
  • Page 11: Operation

    The user must turn the key off and back on to adjust any services. On connecting mains power, an LED on the front of the panel (OGS Logo) will illuminate red. Turn the key switch to on position.
  • Page 12: Maintenance

    • Bump Testing (Gas Response Check) All certified test gases supplied by OGS are classified as non-flammable and non-toxic, however, they may contain gas under pressure and may explode if heated to extreme temperatures and cause asphyxiation in high concentrations.
  • Page 13 Installation & Operation Manual Merlin 1000V+ Page intentionally left blank Rev: 04 08-22...
  • Page 14 Installation & Operation Manual Merlin 1000V+ Page intentionally left blank Rev: 04 08-22...
  • Page 15: Specification

    Installation & Operation Manual Merlin 1000V+ Specification General Model: 1000V+ Size: (H x W x D) 7.08 x 10.03 x 3” (180 x 255 x 77 mm) Housing Material: ABS Polylac - PA765. UL 94 V-1 Mounting: Indoor use - Wall Mounting User Interface Visual Indicators: Audible Alarm:...
  • Page 16 Every effort is made to ensure the accuracy of this document; however, OGS can assume no responsibility for any errors or omissions in this document or their consequences. OGS would greatly appreciate being informed of any errors or omissions that may be found in the content of this document.

Table of Contents