ABB HT568698 Operation Manual page 69

Table of Contents

Advertisement

© Copyright 2016 ABB. All rights reserved.
Maintenance
Cleaning components mechanically
1. Suspend cartridge group from normal suspension point and suspend
from first crane.
2. Secure two lifting loops with swivel lifting eyes in the lower push-off
threads and suspend from a second crane.
3. Rotate cartridge group horizontally by lifting the second crane.
4. When the cartridge group is horizontal, secure one chain block from
one of the upper push-off threads using a swivel lifting eye and sus-
pend from the second crane.
5. Tighten chain block until entire cartridge group is suspended from
second crane.
6. Remove loop from first crane.
Operation Manual / TPL65VA32/33
5
5.5
Page 67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl65va33

Table of Contents