MAINTENANCE PROCEDURE FOR MK 11 1
WARNING: this maintenance procedure is only for appointed Scubapro technicians
that followed a complete course on equipment repair and in no case can replace a
technical repair course delivered by an appointed SCUBAPRO/ UWATEC appointed
staff.
Tools needed:
1.
universal tool
2.
socket
3.
socket extension
4.
field handle tool
5.
o-ring extractor
6.
filter retainer mounting tool
7.
balance chamber tool
8.
torque wrench
nd
9.
2
stage adjustment tool
st
10. 1
stage chamber tool
11. Scubapro blow gun
12. interstage pressure gauge
13. 4 mm Allen key
14. 6 mm Allen key
15. screwdriver
16. work bench with vice
1.
Unscrew all hoses from the 1
age the chrome plating. Remove all the plugs from the 1
key or with the universal tool. Remove the o rings from the plugs with the o ring ex-
tractor tool and inspect.
2.
Remove the inlet protector.
3.
Remove carefully the 2 rubber bumpers with the screwdriver.
4.
Take the field handle tool and use preferably for strength the bigger 7/16" thread and
screw it in one of the HP ports.
For the INT version: Remove the yoke screw, then firmly hold the field handle tool
fixed to the body of the 1
to carefully remove the yoke retainer. Remove the yoke and saddle. Remove the fil-
ter retainer with the screwdriver, the filter and the o ring with the o ring remover. Put
aside the o ring (01.050.138) for inspection.
DISASSEMBLY
st
stage with the universal tool being careful not to dam-
st
stage in the vice and use the socket and socket extension
MK 11 rev 1.1 2006
ST
P/N 43.040.000
P/N 43.191.107
P/N 43.300.009
P/N 43.300.127
P/N 43.300.107
P/N 43.026.101
P/N 43.300.240
P/N 43.300.988
P/N 41.043.000
P/N 43.300.999
P/N 40.978.000
st
stage with the 4 mm Allen
2 / 2
STAGE
Need help?
Do you have a question about the MK11 and is the answer not in the manual?