TIN4D Model : TIN5D DIGITAL HIGH VOLTAGE INSULATION TESTER GUARD EARTH LINE SAFETY PRECAUTION! —Use only on de-energised system. — Check test leads for defects. — Always earth circuit under test. — After testing, allow a few seconds for instrument to discharge circuit under test .
1.SAFETY PRECAUTIONS Electricity can be dangerous - handle it with care. Carefully read the following information before using the the tester. 1.1 The company will not accept liability for any damage or injury caused by misuse or non-complicance with Instructions and safety procedures. This instrument must be used and operated only by a competent trained person and in strict accordance with the instructions.
Page 4
1.6 The Tester has a live circuit warning bleeper. If it is connected to a live circuit of more than 500V, a rapid pulsating bleep will be heard and, in addition, the tester will display a warning message. should this happen, DO NOT proceed to test and immediately.
2.SPECIFICATIONS Display 2 Lines x 20 Characters large L.C.D Bar graph shows test voltage-reise and decay. Test Duration is indicated in seconds. Warning of external voltage presence. Auto-Hold when test stopped and circuit discharge. Low Battery Indication. Insulation Both Models have Four Insulation test voltages and are Auto ranging.
Supply Power 8 x 1.5V "C" size Alkaline battery Control Type COMS Microprocessor Analog to Digital conversion Type Successive Approximation Low current (250uA Typical) Resolution 12 Bits (No Missing Codes) Keypad Type Tactile Membrane Switch Connections Type Color coded Sockets 3.CONNECTIONS GUARD EARTH...
4.TIN4D - INSTRUMENT LAYOUT Test Leads connections Voltage Liquid crystal Selection display Keys GUARD EARTH LINE SAFETY PRECAUTION! — Use only on de-energised system. — Check test leads for defects. — Always earth circuit under test. — After testing, allow a few seconds for instrument to discharge circuit under test .
5.TIN5D - INSTRUMENT LAYOUT Test Leads connections Voltage Liquid crystal Selection display Keys GUARD EARTH LINE SAFETY PRECAUTION! — Use only on de-energised system. — Check test leads for defects. — Always earth circuit under test. — After testing, allow a few seconds for instrument to discharge circuit under test .
6.PREPARATION FOR MEASUREMENT Check the following for damages and status 1. Display. Do not use the Instrument if the display looks abnormal. 2. Keypad. Visually check the Keypad. A damaged keypad will cause the instrument to malfunction. 3. Test Leads. Verify test Leads are free of cracks and check continuity.
7.FUNCTIONS Switching "ON" ON Switch "ON", by depressing the "ON" key TOPTRONIC TIN4D ..500v to 5kV Depressing the "ON" Key will start the Instrument, giving ...Insulation... The Manufacturer's name, type ..Tester..of Instrument and part Number. The Instrument will default to Select test the selections Menu.
Page 11
Insulation Testing ON Switch "ON", by depressing the "ON" key. TOPTRONIC TIN4D ..500v to 5kV Depressing the "ON" Key will start the Instrument, giving ...Insulation... the Manufacturer's name, type ..Tester..of Instrument and part Number. The Instrument will default to Select test the selections Menu.
8.INSULATION RESISTANCE TESTING WITH TIN4D Warning : Insulation test should be conducted on circuits that are de-energized. Ensure circuits are not live before commencing testing. TIN4D Turn instrument "ON" by pressing the "ON" button. The L.C.D. display will advance to the following screen. Select Test 5KV, 2.5KV, 1KV, 500V Select insulation test voltage, for example, 500V.
9.INSULATION RESISTANCE TESTING WITH TIN5D Warning : Insulation test should be conducted on circuits that are de-energized. Ensure circuits are not live before commencing testing. TIN5D Turn instrument "ON" by pressing the "ON" button. The L.C.D. display will advance to the following screen. Select Test 10KV, 5KV, 2.5KV, 1KV Select insulation test voltage, for example, 1000V.
10.INITIALISING - STARTING THE TEST Quick Test A Quick test (less than 16 Secretary) TEST is done by depressing "TEST" for less START/STOP than two seconds. Long Test A Long Test (up to 99.9 Sec) is done by TEST depressing "TEST" for more than three START/STOP Seconds.
11.MAINTENANCE AND CLEANING METHOD Battery replacement Your batteries are situated under the tester-to replace- Switch "OFF" the Instrument. Unplug the test leads from the tester. Unscrew the screw situated at the bottom of the battery cover. Slide the battery cover off the bottom of the tester. Remove the flat batteries from the batteries holder.