ABB HT566739 Operation Manual page 79

Turbocharger
Table of Contents

Advertisement

WARNING
© Copyright 2016 ABB. All rights reserved.
Removal and installation
Remove the turbocharger
Ribs (01) not in the middle at the top:
Completely remove the bearing casing insulation (02) and place a
sling around the bearing casing.
Loosen the fixing screws at the foot.
Lift the turbocharger off the engine and set it down to one side.
Beware of tilting
If support for the turbocharger is not provided or is inadequate, the tur-
bocharger could tip over during installation or removal and cause a se-
rious or even fatal injury.
Support the turbocharger at a suitable point.
If possible secure it using lifting gear.
Wear safety helmet.
Cover the oil connection.
Operation Manual / TPL67-C.. - TPL71-C..
7
7.2
Page 77

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl71-c35

Table of Contents