Advertisement

Quick Links

Blackbird Raven
Assembly Instructions
40" Vertical Rails
Upper Wheel
and handle
Assembly

Axle Housing

Assembly. Bottom
gusset should be ush
with bottom of 40"
vertical rails.
Unbolt 1x2 black end caps and replace when nished
2-hole Support Gussets
4-hole Support Gussets
Call or text me if you need help:
Matthew Freed
214-918-5132
contact@blackbirdcarts.com

Top Equipment Box

Slide down from top

Sliding Shelf

Slide down from top

Lower Equipment Box

Pg. 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Raven and is the answer not in the manual?

Questions and answers

Summary of Contents for Blackbird Raven

  • Page 1 Blackbird Raven Call or text me if you need help: Matthew Freed Assembly Instructions 214-918-5132 contact@blackbirdcarts.com 40” Vertical Rails Unbolt 1x2 black end caps and replace when nished Top Equipment Box Upper Wheel Slide down from top and handle Assembly...
  • Page 2 Blackbird Raven Call or text me if you need help: Matthew Freed Assembly Instructions 214-918-5132 contact@blackbirdcarts.com 1. Slide 90 degree brackets on to top, back side of Lower Equipment Box. Make ush with back of top rail. 2. Lower 40-inch verticals on to back side of Equipment Box. Make bottom of Vertical Rail ush with bottom of box.
  • Page 3 Blackbird Raven Call or text me if you need help: Matthew Freed Assembly Instructions 214-918-5132 contact@blackbirdcarts.com 3. Turn assembly upside down and place on a tabletop to install caster wheels and rear axle assembly. Bottom of Equipment Box Install 3 washers and bolts into T-Nuts that Rear Axle have been pre-installed in rails.
  • Page 4 Blackbird Raven Call or text me if you need help: Matthew Freed Assembly Instructions 214-918-5132 contact@blackbirdcarts.com 4. Place assembly on all 4 wheels on the oor. Then, slide mixer shelf down from top and follow with Upper Monitor Box. Tighten bolts to secure in place.

Table of Contents