Page 3
PARTS LIST & FITTINGS Part No ITEM NO. Part No. PART NAME Default/QTY. Peveril Side Frame 3950 BEAM - for 4m peveril only CFB1 2375 L BAR CFB2 2375 T BAR CFB2 CFB1 1900 T BAR ROOF PANEL 25mm M10 x 100...
Page 4
Step 1 Attach Both EFB End Bars to PL1 Peveril Legs. 2 people recommended to fit this shelter. DETAIL B SCALE 1 : 16 Note: Move legs to desired location (shelter must be sub surfaced 800mm minimum). Fix the central post in place...
Page 5
Step 2 Loosely fasten FRB Front/Rear Bar to PL1Peveril legs, this gives you the outside post positions. Step 3 Do the same for the rear of the shelter and secure the foot plates in position. Note: Make sure allignment is correct...
Page 6
Step 4 Bolt the CFB2 Central Frame Bar 2 to FRB Side Frame Bars. CFB2 Step 5 Secure all CFB1 Central Frame Bars to the CFB2 Central Frame Bars 2 & EFB End Frame Bars CBF1 CFB2 CBF1 CBF1 CBF1 Tighten all bolts at this point and make sure shelter is secure.
Page 7
Step 6 Finally screw the RP Roof Panel to the top of the frame spacing each section evenly between front, rear, left and right. Peveril Frame Note: A good spacing for Tec-Screws is 200-300mm.
Touch up any exposed metal should it get scratched CONTACT DETAILS: Email : Sales@nobutts.co.uk Web : www.nobutts.co.uk Tel : 0800 1777 052 NBB, Unit 5, 145 Sterte Road, Poole, Dorset BH15 2AF All Parts and Fixings checked by: Print Name: Signature:...