Download Print this page

Advertisement

Quick Links

Pure & Easy
CONTACT US:
If you have any questions about the installation of YITAHOME products, just contact us at
+� (���) ���-���� from Mon-Fri �:�� AM-�:�� PM PST / Sat. �:�� AM-��:�� PM PST or e-mail
us at after-sale.cs@hotmail.com
Alternative method to contact us (amazon.com orders only)
�.Log into your Amazon account
�.Go to "Your Orders" and find the purchase
�.Click on "Contact Seller"
ASSEMBLY INSTRUCTIONS
FTPLCG-0001
FTPLCG-0002

Advertisement

loading
Need help?

Need help?

Do you have a question about the FTPLCG-0001 and is the answer not in the manual?

Questions and answers

JESUS RIVERA
June 12, 2025

while installing the curtain its has numbers which numbers goes where is it 1-4

Subscribe to Our Youtube Channel

Summary of Contents for YitaHome FTPLCG-0001

  • Page 1 Pure & Easy CONTACT US: If you have any questions about the installation of YITAHOME products, just contact us at +� (���) ���-���� from Mon-Fri �:�� AM-�:�� PM PST / Sat. �:�� AM-��:�� PM PST or e-mail us at after-sale.cs@hotmail.com Alternative method to contact us (amazon.com orders only)
  • Page 2: Tools Required For Assembly

    ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS Tools Required For Assembly 1. It required two or more people to complete assembly. 2. You will need one stepladder. 3. You may need to wear protective gloves. 4. A safety hat is recommended. ITEM DESCRIPTION Pole Beam Beam...
  • Page 3 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS ITEM DESCRTION Roof Metal Sheet Inside Roof Connector Outside Roof Connector Finishing End Finishing End Roof Panels Roof Panels Roof Panels Roof Panels Roof Panels Roof Panels x104 Hook Mosquito Sidewall Solid Sidewall Allen Key/Wrench x105 Screws M6x16 Screws M6x35 Screws M6x16...
  • Page 4 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS 16 M6 x 12 x 12 x 12 x 12 Hooks (V) to each slot of sidewall track (B and C ). Connect B and C into one beam using screws #1. Attention: All 24 Hooks (V) need to be installed, otherwise it will affect to zip up fully. x 14 x 14 x 14...
  • Page 5 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS Affix the frame with corner solidifying bars (J1 and J2) using screws #1 as above. Then affix the frame with corner solidifying bars (K) using screws #1 as above.
  • Page 6 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS Connect the inside roof connector (P) with the corner roof bar (F) using screws #1 as following. Finish connecting beams using corner covers (M) and screws I as shown in diagram. Connect the triangle roof metal sheet (O) with the corner roof bar (F) and pole (A) Affix middle beams using joint cover (N) and screws #4 as shown in diagram.
  • Page 7 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS Connect outside roof connector (Q) to inside roof connector (P) using screws #1 Attach roof bar (P) to inside roof connector using screws #1 as above. as above.
  • Page 8 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS Cover metal brackets (H, H1 and H2) to roof panels (T, T1 and T2) as shown Cover roof panels (U, U1 and U2) like Step 11 as shown in diagram. in diagram. Overall roof assembly.
  • Page 9 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS Please don't put the sidewalls back to front. Affix finishing bars (U & U1) by (R & S) using screws #1 to roof bar and corner Hang up solid sidewall (W1) and mosquito sidewall (W) as shown in the diagram. roof bar as shown in diagram.
  • Page 10 ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS Installation Completed...

This manual is also suitable for:

Ftplcg-0002