studio tk punt STOCKHOLM Installation Manual

Advertisement

punt
Installation Guides
Section:
STORAGE
Description:
STOCKHOLM STORAGE INSTALLATION GUIDE
Stockholm Storage (PCSS)

Part and Product Identification

A
B
C
Date:
May 2021
Page No:
1 of 3
PNT_101
Rev. No: 1
A - Credenza x1
B - Horizontal Beam x2
C - Support Leg x2
D - L-Bracket
(D56-0004) x4
E - #8x 5/8" Ph Screw
(E57-0002) x8
F - M6x25 Bolt
(E56-0143) x8
G - M6 Locknut
(E56-0144) x8
H - 1/4" SAE Flat Washer Zinc
(E57-0044) x8
I - Allen n°4
(F57-0002) x1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the punt STOCKHOLM and is the answer not in the manual?

Questions and answers

Summary of Contents for studio tk punt STOCKHOLM

  • Page 1 punt Installation Guides Section: STORAGE Date: May 2021 Page No: 1 of 3 Description: STOCKHOLM STORAGE INSTALLATION GUIDE PNT_101 Rev. No: 1 Stockholm Storage (PCSS) Part and Product Identification A - Credenza x1 B - Horizontal Beam x2 C - Support Leg x2 D - L-Bracket (D56-0004) x4 E - #8x 5/8"...
  • Page 2 punt Installation Guides Section: STORAGE Date: May 2021 Page No: 2 of 3 Description: STOCKHOLM STORAGE INSTALLATION GUIDE PNT_101 ASSEMBLE FRAME SECURE FRAME STEP 1: Assemble Horizontal Beam and Frame Leg together as shown above. STEP 2: Secure the Frame Assembly with Hardware provided.
  • Page 3 punt Installation Guides Section: STORAGE Date: May 2021 Page No: 3 of 3 Description: STOCKHOLM STORAGE INSTALLATION GUIDE PNT_101 SECURE CREDENZA NOTE: L-Brackets come pre-installed STEP 3: Place the Credenza on top of the Frame Assembly. Secure it by fastening the Brackets on the Frame to Credenza.

Table of Contents