STANDARD INSTALLATION 1. These equipments are acquired a safety ground surface such as Rubber mat or impact-absorbing material under and all around play equipments. 2. Accessible Routes (Reference) A ground-level accessible route connects play components at ground level. 60 inches (1525mm) minimum clear width ...
Page 3
Basic Installing method *Footing (Surface mount) 1. Draw line as footing layout drawing. 2. Make sure the ground level of site. 3. Assemble Deck with posts. 4. Adjust right position. 5. Assemble Climbers (i.e. Arched climber, Chain climber, etc.) 6. Assemble Slides. 7.
Playground Maintenance Information SITE NAME: SITE ADDRESS: PLANNED BY: ADDRESS: PHONE: EQUIPMENT INFORMATION MANUFACURE: SALES REPRESENTIVE: l ADDRESS: PHONE: SALES ORDER NUMBER DATE OF PURCHASE: INSTALLATION INFORMATION INSTALLED BY: ADDRESS: PHONE: DATE OF INSTALLATION: INSPECTION INFORMATION DEPARTMENT IN CHARGE OF INSPACTION: INSPECTION FREQENCY REATE: □...
MAINTENANCE Your playground had been designed using the highest quality materials. It is a highly active structure that has been engineered, manufactured and installed for the utmost safety of the user. For this reason, it will require routine inspection and maintenance. Certain heavily used areas and features will wear faster than others.
Page 10
Monthly 1. Tighten all nuts and bolts. 2. Detailed inspection shall be carried out every month. Other general safety points include: • No openings on playground equipment should be more than 3 1/2 inches or less than 9 inches where children's heads or bodies could be trapped. •...
Routine Maintenance Checklist Your playground had been designed using the highest quality materials. It is a highly active structure that has been engineered, manufactured and installed for the utmost safety of the user. For this reason, it will require routine inspection and maintenance. We recommend this to be done on a daily basic.
Page 12
Detailed Maintenance Check List Record CLIENT NAME SITE NAME INSPECTOR DATE CHECKLIST ITEM NUMBER PROBLEM ACTION DATE DATE REPAIRS TAKEN COMPLETE...
Need help?
Do you have a question about the UNIONLAND 52-105-200 and is the answer not in the manual?
Questions and answers